SCP-8963
Unknown
~
medium confidence
SCP-8963
Expected annual
$6.9M
One-time setup
$12.6M
Annual recurring
$6.7M
Personnel
15
One-time capital and contingency costs are dominated by site-level temporal hardening and a contingency reserve (~$10–12.6M total). Recurring annual costs (~$6.7M baseline) are driven primarily by dedicated 24/7 staffing, per-arrival processing, long-term care for non-returnable individuals, research/testing, and site overhead.
One-Time Capital Costs
Total: $12.6M
Annual Recurring Costs
Total: $6.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.7M/yr
Normal operational year with no major incidents; recurring costs at planned baseline (5% long-term retention).
steady arrival rate
no public exposure
no major containment incidents
🚨
Minor Incident
$7.7M/yr
Localized incident or limited public exposure requiring legal/PR response, additional medical/psych services, and short-term contractor support.
limited leak or local media exposure
isolated containment incident requiring contractors
🚨
High Nonreturn Rate
$7.4M/yr
Higher fraction of arrivals require long-term care (approx. 10% retention), increasing annual housing/medical/security costs.
increase in non-returnable individuals
policy decision to retain more subjects long-term
🚨
Major Breach
$13.7M/yr
Major containment failure or facility-wide temporal event requiring emergency operations, use of contingency reserves and large-scale contractor/relocation expenses.
facility-wide temporal isolation
large-scale breach or civil exposure
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#5] Shift coverage for 24/7 security presence (1 per shift → 3 FTE). |
| Medical Officer | 3 | [#5] Triage/medic/clinical coverage across 3 shifts. |
| Containment Technician / Researcher | 3 | [#5] Containment and technical operations across shifts. |
| Research Scientist (supervisory) | 4 | [#5] Supervisory scientists and principal investigators (2–4 recommended; used 4). |
| Administrative Staff / Support Techs | 2 | [#5] Administrative, logistics, and support technicians on standard schedules. |
Confidence Notes
Estimates draw directly from analyst notes and recommended planning figures for most line items (medium confidence). Major uncertainty remains around site-level temporal hardening (speculative) and the long-term retention fraction of arrivals, which can materially change recurring costs (low confidence on those subitems).