SCP-8968
Neutralized
~
medium confidence
SCP-8968
Expected annual
$8.4M
One-time setup
$8.8B
Annual recurring
$3.4M
Personnel
10
Minimal remote characterization and monitoring pathway requires modest one-time imagery/assessment and low recurring monitoring and specialist staff costs; full retrieval (robotic or crewed) drives one-time costs into the hundreds of millions to multiple billions, dominated by mission, launch, insurance and contingency.
One-Time Capital Costs
Total: $8.8B
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Minimal monitoring and curation year with no retrieval or major incidents.
periodic_imaging
routine_conservation
standard_admin
🚨
Minor Incident
$3.9M/yr
Diplomatic/legal pressure or localized radiological finding requiring extra surveys, legal costs, and PR/mitigation.
diplomatic_pressure
unexpected_radiological_assay
public_inquiry
🚨
Robotic Retrieval Initiated
$503.4M/yr
Policy decision to perform a full robotic retrieval mission in a given year, incurring mission capital costs plus operations.
policy_decision_to_retrieve
mission_approval_and_launch
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#14] Archaeologists / aerospace historians focusing on provenance and analysis. |
| Conservator | 2 | [#12, #14] Conservation specialists for mixed-material stabilization and long-term treatment. |
| Radiochemist | 1 | [#11, #14] Radiological assay, dosimetry, and isotope analysis. |
| Astrodynamics Engineer | 1 | [#3, #14] Mission design and orbital tasking support for characterization and any retrieval planning. |
| Security Analyst | 1 | [#16, #14] Security/counterintelligence oversight and classified handling policy. |
| Administrative Staff | 1 | [#3, #14] Program management, contracting oversight and administrative support. |
| Lab Technician | 2 | [#13, #14] Laboratory operations, sample handling, and routine testing support. |
Confidence Notes
Estimates are constrained by analyst ranges but include wide uncertainty for mission-level items (launch, mission architecture, and insurance). Neutralized object lowers containment uncertainty, but optional recovery pathways create large cost variance.