SCP-8984
Euclid
~
medium confidence
SCP-8984
Expected annual
$158.4M
One-time setup
$2.1B
Annual recurring
$152.2M
Personnel
80
One-time capital program for expanded monitoring and contingency funding is large (≈$2.05B); ongoing annual operations dominated by flagship telescope operations, research staffing, OPSEC/cover-story activity and infrastructure ops (~$152M/yr).
One-Time Capital Costs
Total: $2.1B
Annual Recurring Costs
Total: $152.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$152.2M/yr
Normal year with routine monitoring, research, OPSEC and no major public incidents.
routine_operations
no_major_leaks
🚨
Minor Incident
$167.2M/yr
Localized leak or contested civilian claim requiring emergency PR/legal action, quick retasking and modest surge of covert activity.
moderate_public_leak
civilian_research_challenge
🚨
Major Public Exposure
$402.2M/yr
Significant public exposure or proof that requires large-scale mitigation, international coordination and major emergency scientific campaigns.
widespread_public_exposure
international_scientific_response
Personnel
80 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 40 | [#8, #9, #27] Astrophysicists, instrument scientists and theoretical researchers (data analysis and publication-controlled work). |
| Security Officer / MTF Agent | 30 | [#10] MTF Gamma-5 operational personnel (salary portion included in staff_wages; ops in mtf_gamma5_ops). |
| Data Engineer / Analyst | 6 | [#6, #7, #8] HPC and data pipeline engineers for storage, archiving and analysis. |
| Engineer / Maintenance | 2 | [#4, #6] Facility and instrument maintainers (ground observatory and HPC upkeep). |
| Administrative Staff | 1 | [#12, #18] Administrative and program management support for legal, travel and controlled dissemination. |
| Medical Officer | 1 | [#26] Medical/psychological support lead for staff healthcare and retention. |
Confidence Notes
Analyst notes provide detailed order-of-magnitude ranges for most line items allowing a mid-range budget to be constructed, but large uncertainties remain (choice between commandeering civilian assets vs new-build, wide cost ranges for launches/space assets and low-frequency catastrophic scenarios).