SCP-8995
Thaumiel
~
medium confidence
SCP-8995
Expected annual
$2.1M
One-time setup
$4.1M
Annual recurring
$2.0M
Personnel
7
Initial one-time startup and contingency reserves are the dominant upfront costs (~$4.11M), driven by legal drafting, contingency/insurance reserves, and facility/equipment retrofits; recurring operations are estimated at ~$2.05M/yr, driven by staffing, research/monitoring, legal/cover-up budgets and psychological support, partially offset by mortuary savings.
One-Time Capital Costs
Total: $4.1M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal operational year with no major incidents; all recurring programs and reserves funded at planned levels.
routine_operations
scheduled_reviews
no major exposures
🚨
Minor Incident
$2.1M/yr
Localized incident requiring additional forensics, modest extra cover-up/amnestics, short-term staff overtime and temporary morgue throughput increases.
single-site anomalous death with public exposure risk
additional forensic/autopsy throughput
🚨
Major Breach
$5.0M/yr
Severe failure or cessation of SCP-8995-A cooperation requiring large-scale procurement of civilian mortuary services, mass storage, emergency logistics and insurance drawdown.
SCP-8995-A ceases operations
mass-casualty disposal without Agreement support
🚨
Political Exposure
$2.8M/yr
Significant leak or legal challenge causing large-scale litigation, settlements and intensive public-relations operations.
public leak
high-profile next-of-kin litigation
🚨
Research Scale Up
$2.6M/yr
Accelerated research campaign or controlled testing requiring expanded staffing, equipment and higher operational tempo.
research breakthrough
large-scale experimental program
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Liaison Officer / Handler | 3 | [#3] Dedicated liaison/handler staff (2–4 FTE estimated; included in staff_wages). |
| Security Officer / MTF Agent | 4 | [#14] On-scene guards and site control personnel (annual security staffing included in staff_wages). |
Confidence Notes
Estimates are mid-range selections from widely varying analyst-provided ranges; many costs scale with organization size, incident rate and the opaque behavior of SCP-8995-A, so uncertainty remains moderate despite detailed line items.