SCP-9018
Unknown
?
low confidence
SCP-9018
Expected annual
$885.2M
One-time setup
$8.1B
Annual recurring
$815.2M
Personnel
270
Estimated one-time capital of approximately $8.10B driven by Facility-0 construction, containment R&D, contingency/reserve funds, and specialized hardware; recurring operations are ~ $815M/yr dominated by research/surveillance, intelligence, contractors, and an unknown-risk surcharge.
One-Time Capital Costs
Total: $8.1B
Annual Recurring Costs
Total: $815.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$815.2M/yr
Normal operational year with no major incidents; standard containment servicing, staffing, surveillance, and legal/cover operations.
routine_operations
scheduled_maintenance
standard_research_cycles
🚨
Minor Incident
$1.0B/yr
Localized containment breach or significant subsystem failure requiring emergency mobilization, temporary deployment of contingency funds, repairs, and legal/PR response.
localized_breach
sensor_alerts
failed_component_replacement
🚨
Major Breach
$5.8B/yr
Activation of Protocol ONYX BALDUR or multiversal-scale containment failure requiring global response, heavy use of contingency reserves, international coordination, and possibly catastrophic mitigation.
Protocol_ONYX_BALDUR_activation
multiversal_collapse
large_scale_containment_failure
Personnel
270 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 120 | [#6] Multiple shifts of cleared armed guards; count chosen to reflect 24/7 coverage and perimeter defense. |
| Elite Response / Specialist Team | 20 | [#6] Highly trained intervention teams (breach response, anti-ontic specialists) held at ready. |
| Research Scientist | 80 | [#7] Physicists, multiversal theorists, thaumaturgical researchers and supporting technical staff. |
| Engineer / Maintenance | 20 | [#4, #11, #21] Reactor, facility systems, automated defenses, and containment hardware maintenance staff. |
| Administrative Staff | 15 | [#16] Administration, records, HR, and cover-story support. |
| Medical Officer | 5 | [#19] On-site medical and psychiatric support for staff and memetic incidents. |
| Software / AI Engineer | 10 | [#27] Continuous software, AI maintenance, firmware updates, and isolated update pipeline operations. |
Confidence Notes
Costs are low-confidence due to extreme uncertainty in required ontological engineering, the broad ranges in analyst estimates, and potentially unbounded escalation paths associated with multiversal/ontological failure modes.