SCP-9021
Object
~
medium confidence
SCP-9021
Expected annual
$180.8M
One-time setup
$1.4B
Annual recurring
$173.6M
Personnel
236
Initial capital outlay is large due to hardened underground facilities, space monitoring infrastructure, containment R&D and contingency reserves (~$1.41B one-time). Main recurring costs are specialized research, monitoring, security and covert operations (~$174M/year).
One-Time Capital Costs
Total: $1.4B
Annual Recurring Costs
Total: $173.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$173.6M/yr
Normal operational year with routine research, monitoring, maintenance and covert activity; no major incidents or breaches.
routine operations
scheduled launches/maintenance
no major incidents
🚨
Minor Incident
$178.6M/yr
Localized SCP-9021-C event or limited SCP-9021-B casualties requiring additional medical response, investigation, temporary surge hires and small-scale PR/containment actions.
localized C-event
small cluster of B casualties
targeted PR/amnestic operations
🚨
Major Breach
$223.6M/yr
Significant SCP-9021-C structural event or field breach leading to site damage, multiple casualties, broad evacuations and substantial covert operations to suppress public knowledge.
site-scale C-event
multiple B casualties
international exposure risk
🚨
Catastrophic Breach
$1.2B/yr
Widespread, escalatory event (e.g., large-scale coordinated A/B/C events or loss of containment) requiring activation of catastrophic reserves, mass mitigation and possible orbital interventions.
multi-site cascade
public mass-exposure
need for orbital/large-scale interventions
Personnel
236 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 45 | [#4, #17] Laboratory and modelling staff performing anomalous astrophysics, memetic research and simulations. |
| Research Senior / Project Lead | 11 | [#4, #14] Senior research leadership and containment R&D project management. |
| Memetic Containment Officer / Specialist | 20 | [#4, #9] Specialists trained in memetic-safe protocols and handling affected subjects/patterns. |
| Security Officer / MTF Agent | 95 | [#6, #20] Site security, guard rotations, tactical response teams and perimeter security. |
| Field Agent / Rapid Response | 40 | [#6, #7, #20] Rapid deployment teams for capture, interdiction and covert field missions. |
| Medical Officer | 6 | [#8] Medical and psychiatric staff for containment wards and casualty care. |
| Engineer / Maintenance | 10 | [#2, #17] Facilities, power systems, generators, HPC and satellite hardware maintenance. |
| Administrative Staff | 9 | [#10, #11, #15] Legal, intel-liaison admin, records management and veil/cover operations support. |
Confidence Notes
Estimates aggregate wide provided ranges and mix of conventional (well-understood facilities, wages) and speculative costs (space missions, catastrophic reserves, covert ops). Medium confidence reflects good mapping of line items to categories but high variance in tail-risk one-time reserves and mission-level costs.