SCP-9028
Unknown
~
medium confidence
SCP-9028
Expected annual
$6.8M
One-time setup
$10.1M
Annual recurring
$6.6M
Personnel
29
Initial one-time establishment costs are approximately $10.1M driven by infrastructure, equipment (drones/aircraft/vehicles) and laboratory/R&D buildout; annual operations run roughly $6.6M/yr driven by staff wages, helicopter/UAV operations, research & monitoring, covert local control and contingency funds.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $6.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.6M/yr
Normal uneventful year with no major incidents; routine operations, maintenance, research and community management continue.
routine_operations
no_major_breach
steady_equipment_attrition
🚨
Minor Incident
$7.0M/yr
Localized breach or intrusion (unauthorized Protocol Mithra attempt) resulting in equipment losses, overtime, local mitigation and limited public-management action.
unauthorized_ritual_attempt
equipment_loss
overtime_and_amnestics
🚨
Major Breach
$9.1M/yr
Significant containment breach with public exposure risk, heavy equipment destruction, emergency relocation/evacuation and large PR/legal operations.
media_exposure
mass_pilgrimage
large_scale_equipment_loss
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#3] Local-hire guards and Foundation-trained response personnel for 24/7 site security (rotations). |
| Research Scientist | 10 | [#10] Archaeologists, linguists, botanists, xenobiologists, astronomers and engineers (8–12 FTEs; 10 assumed). |
| Engineer / Maintenance (Rapid-response support) | 6 | [#4] Tactical team/technicians maintaining vehicles, armored response and specialized gear readiness. |
| Medical Officer | 1 | [#20] On-site medic and decontamination readiness staff. |
Confidence Notes
Analyst notes are detailed and provide explicit item estimates, but the SCP's anomalous behavior (probe destruction, unknown ingress methods), political sensitivity in-region and optioned items (helicopter purchase vs lease, scale of R&D) introduce substantial uncertainty; quantities are order-of-magnitude estimates rather than fixed bids.