SCP-9040
Euclid
~
medium confidence
SCP-9040
Expected annual
$1.7M
One-time setup
$3.2M
Annual recurring
$1.6M
Personnel
13
Initial capital and construction are the primary one-time costs (~$3.2M) for a reinforced flooded chamber, observation wall and systems; recurring costs are driven by staffing, maintenance, energy and negotiated trade items (~$1.65M/yr baseline).
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal operations with recurring staff, maintenance, energy and baseline trade consumables.
regular operations
scheduled maintenance cycles
biweekly negotiations within expected cost bands
🚨
Trade Demand Escalation
$2.1M/yr
SCP-9040-02 demands substantially more or rarer trade items, driving up procurement, legal clearance and secure transfer costs for the year.
SCP-9040-02 requests high-value or regulated items
procurement of rare goods requiring permits or escorts
extended negotiation requiring additional logistics
🚨
Containment Catastrophic Breach Repair
$2.4M/yr
A containment failure or major structural breach necessitates large-scale emergency remediation, environmental cleanup and accelerated repairs.
major structural failure of chamber or observation wall
massive flooding / pump failure compounded by power outage
environmental contamination requiring external remediation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security guards (site, 24/7 shifts) | 6 | [#9] Estimated 2 guards/shift × 3 shifts + overlap for continuous coverage. |
| Research & technical staff (PI, technicians, controls engineer) | 4 | [#10] Typical team: 1 PI, 1–2 research technicians, 1 controls/facilities engineer. |
| Liaison / negotiation personnel | 1 | [#11] Dedicated or shared FTE for biweekly coordination and travel. |
| Facilities / maintenance engineer | 1 | [#4, #5, #16, #18] On-site engineer/technician responsible for pumps, HVAC, backup power and contractor coordination. |
| Administrative / records clerk | 1 | [#22] Handles classified record-keeping, printing, access logs and audits. |
Confidence Notes
Containment, structural and systems costs are reasonably well-specified in the notes so capital and baseline Opex estimates are moderately reliable; major uncertainty remains around negotiated trade item costs and low-probability catastrophic events, which can cause large swings.