SCP-9055
Keter
?
low confidence
SCP-9055
Expected annual
$21.1M
One-time setup
$216.2M
Annual recurring
$20.1M
Personnel
60
Initial establishment costs are very large (~$216M) driven by site works, relocation/contingency reserves and specialized R&D; annual running costs are ~ $20.1M driven by specialized staff wages, mnestic production, automated security and contingency replenishment.
One-Time Capital Costs
Total: $216.2M
Annual Recurring Costs
Total: $20.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.1M/yr
Normal operational year with no major incidents; routine monitoring, staffing and upkeep only.
steady_operations
routine_maintenance
🚨
Minor Incident
$20.9M/yr
Localized equipment or sensor failures, small robotic loss or a single human exposure requiring medical/legal response.
sensor_failure
robotic_damage
limited_human_exposure
🚨
Major Breach
$35.1M/yr
Significant containment breach or automation failure leading to human casualties, major legal settlements and emergency remediation.
automation_failure
widespread_human_exposure
memetic_spread
🚨
Relocation Or Large Scale Isolation
$140.1M/yr
Decision and execution of abandonment/relocation or construction of a new remote subterranean-capable site due to unmanageable risk.
containment_unmanageable
structural_failure
strategic_decision
Personnel
60 total
| Role | Count | Notes |
|---|---|---|
| Class-Z Personnel (mnestic-enabled operatives) | 20 | [#2] Dedicated mnestic-enabled observers/operatives paid at premium compensation and rotation schedules. |
| Security Officer / MTF Agent | 30 | [#9] Conventional armed security presence for above-ground interface, contingencies and robot replacement. |
| Medical Officer | 10 | [#3] On-site physicians, neurologists/psychiatrists and nursing staff for mnestic administration, monitoring and long-term care. |
Confidence Notes
Estimates are low-confidence due to the antimemetic nature of SCP-9055, deep uncertainty around required mnestic drug development costs, and strategic choices (automation vs human teams) that vastly change capital and operating expenses.