SCP-9067
Unknown
~
medium confidence
SCP-9067
Expected annual
$11.9M
One-time setup
$34.6M
Annual recurring
$11.4M
Personnel
24
Initial one-time setup is approximately $34.6M driven by secure vault construction, prototype/test-chamber build, emergency reserves, countermeasure procurement and interceptor fleet; ongoing annual costs are about $11.38M driven by staff wages, R&D/monitoring, operations/maintenance and intelligence/cover activities.
One-Time Capital Costs
Total: $34.6M
Annual Recurring Costs
Total: $11.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.4M/yr
Normal operational year with no major incidents; routine research, monitoring, maintenance and staffing costs only.
no containment breach
no public exposure
routine operations
🚨
Minor Incident
$12.9M/yr
Localized activation or containment event requiring field recovery, forensic analysis and limited remediation.
single-device activation
localized contamination or rematerialization
need for rapid-response recovery
🚨
Major Breach
$24.4M/yr
Significant breach or public exposure requiring large-scale neutralization, allied support, legal/PR actions and compensation.
public exposure / mass-casualty event
multiple-device coordinated activation
international incident requiring military aid
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Senior Researcher | 6 | [#10] Senior research staff for containment research and R&D (approx. $200k each). |
| Engineer / Maintenance | 4 | [#10] Engineers for hardware, fabrication, interceptor integration and facility systems (approx. $180k each). |
| Security Officer / MTF Agent | 8 | [#10] Armed guards/MTF personnel for on-site security and rapid response (approx. $80k each). |
| Legal / Cover Operative | 2 | [#10] Legal and cover-story liaisons/operatives supporting treaty management and concealment coordination (approx. $250k each). |
| Psycholinguist / Semantic Analyst | 4 | [#26] Specialist personnel recruited for ideometric/psychospheric analysis and model development (costs included separately). |
Confidence Notes
Analyst notes provide detailed line-item estimates for procurement and operations, supporting a moderate confidence. Uncertainty remains due to anomalous behavior, uncontained status, and nonlinear scaling risk if SCP capabilities expand, so a medium confidence level reflects that variability.