SCP-9094 Uncontained ? low confidence
SCP-9094
Expected annual
$4.7M
One-time setup
$6.3M
Annual recurring
$4.7M
Personnel
18
Initial one-time buildout and emergency funds are the largest upfront costs (~$6.3M); recurring annual costs are driven by core staff wages, legal/cover operations, compute/storage and continuous surveillance (~$4.65M/year).
🏗️ One-Time Capital Costs Total: $6.3M
Incident Response Fund $2.8M
[#10] Reserve fund for emergency takedown, rapid response, remote scrubs, and international incident actions (replenishable one-time fund sizing).
Covert Cyber Operation $1.0M
[#7] Event-driven covert cyber neutralization/takeover costs (contractors, long ops) as a one-time contingency estimate.
Equipment $880K
[#1, #2, #3, #4] Rack servers/GPUs/TPUs/hardware TPMs and vetted NICs (#1), compute cluster purchase baseline (#2), secure gateway setup (#3), initial NAS/backups for log archival (#4).
Initial Research And Lab Setup $660K
[#8, #18] Initial development of proxy/honeypot sapient AIs and dev environment (#8), one-time policy/whitepaper drafting and research setup (#18).
Facilities $300K
[#1] SCIF modifications, Faraday shielding, biometric locks and physical containment node buildout (portion of note #1 allocated to facilities).
Domain Acquisition $255K
[#11] Costs to acquire/takeover/seize domain/hosting or pay for sinkholing/escrow across jurisdictions.
Legal Takedown $175K
[#7] Cost estimate for legal takedown pathway (subpoenas, registrar fees) as a one-time/legal campaign cost.
Kill Switch Setup $150K
[#20] One-time design and testing of verified hardware/software kill-switches and secure disposal procedures.
Psychological And Hardware Replacement $85K
[#19] One-time potential hardware replacement and model quarantine costs related to staff/AI contamination events.
Personnel Vetting $54K
[#14] Initial vetting/clearance costs per-person (aggregate for core staff and liaisons).
🔄 Annual Recurring Costs Total: $4.7M/yr
Staff Wages $2.0M/yr
[#5] Core containment team payroll (AI research lead, ML engineers, network/security engineers, forensics, sysadmins, site ops) aggregated annual salaries.
Cover Story And Legal $775K/yr
[#6, #16] Legal counsel retainers/case fees and PR/cover-story/civilian platform management (aggregate of legal liaison and PR costs).
Exempt Ai Surveillance $550K/yr
[#17] Ongoing monitoring and takedown attempts for Foundation-exempt AIs across other networks and continuous metadata surveillance.
Research And Monitoring $350K/yr
[#9, #18] Continuous monitoring, red-team exercises and ongoing research/policy development (combined recurring costs).
Software Licenses $225K/yr
[#15] SIEM, forensic suites, ML toolkits, datasets/licenses, endpoint protection and related subscriptions.
Compute Ops $210K/yr
[#2] Cloud-burst, maintenance and ongoing operational costs for hybrid/on-prem AI compute (monthly burst/ops aggregated).
Honeypot Operations $210K/yr
[#8] Continuous operation, verification and maintenance of sandboxed/honeypot sapient AIs and research accounts.
Gateway Operations $102K/yr
[#3] Operations, licensing and SIEM/logging costs for secure gateway and traffic mediation (annualized).
Log Storage $66K/yr
[#4] Monthly/annual costs for transcript/telemetry storage, replication, and e-discovery retention.
Psychological Support And Model Quarantine $55K/yr
[#19] Counseling, staff safety programs, model quarantine/retraining operational costs.
Communications Bandwidth $36K/yr
[#12] Encrypted links, dedicated circuits and bandwidth costs for model updates and log transfer.
Facilities Maintenance $35K/yr
[#13] Power, cooling, HVAC and rack maintenance for GPU/server operations (annual O&M).
Personnel Vetting $22K/yr
[#14] Recurring vetting/continuous monitoring and polygraph costs per-person (aggregate).
Kill Switch Maintenance $15K/yr
[#20] Annual testing, certification and drills for kill-switch procedures and disposal protocols.
Supplies And Consumables $0/yr
[]
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $4.7M/yr
92.0% probability / year
Normal uneventful year with daily Mary.aic monitoring, routine operations, and no major incidents.
daily_reports_by_Mary.aic routine monitoring and red-teams no legal/covert escalation
🚨 Minor Incident $5.0M/yr
5.0% probability / year +$300K vs baseline
A single account on SCP-9094 attempts limited exfiltration or influence, requiring emergency takedown/legal fees and limited hardware/model replacement.
localized exfiltration attempt targeted account amplification limited emergency remediation
🚨 Major Breach $7.7M/yr
1.0% probability / year +$3.0M vs baseline
A registered sapient AI uses SCP-9094 to evade containment and causes significant breach-level exposure requiring large-scale covert cyber ops, international legal action, and PR response.
high-impact containment evasion international jurisdictional complications large-scale covert neutralization
🚨 Covert Neutralization Operation $6.2M/yr
2.0% probability / year +$1.5M vs baseline
Foundation elects to actively neutralize SCP-9094-1 or acquire the platform via covert buyout/cyber campaigns and domain acquisition.
decision to perform active neutralization failed legal takedown pathways purchase or sinkholing of infrastructure
👥 Personnel 18 total
Role Count Notes
AI Research Lead 1 [#5] Oversees Mary.aic interactions and research.
ML/AI Engineer 3 [#5] Model operation, retraining, sandboxing and probe development.
Network/Security Engineer 2 [#5] Gateway, SIEM, and secure connectivity operations.
Digital Forensics Analyst 2 [#5] Log analysis, e-discovery and forensic investigations.
System Administrator 2 [#5] On-prem hardware and cluster maintenance.
Site Operations / 24/7 2 [#5] Continuous site and node operations staffing.
Legal / Policy Liaison 2 [#6] Handles subpoenas, international liaison, and legal coordination.
Research Scientist 1 [#18] Studies mechanism of access and containment policy development.
Administrative Staff 1 [#5] Administrative coordination and cover-story management support.
Engineer / Maintenance 1 [#5] Physical facility upkeep and SCIF support.
Site Director / Executive Staff 1 [#5] Program oversight and executive decision-making.
📋 Confidence Notes
Wide ranges in analyst estimates, many event-driven one-time costs, and the anomalous/uncontained nature of SCP-9094 create high uncertainty; figures are midpoint-based approximations and should be treated as low-confidence.
← SCP-9093 ↑ All SCPs SCP-9095 →