SCP-9111 Unknown ? low confidence
SCP-9111
Expected annual
$107.8M
One-time setup
$416.5M
Annual recurring
$77.0M
Personnel
105
Initial capital requirements are dominated by South Pole facility construction and a large emergency contingency reserve (~$416.5M one-time). Ongoing annual costs are driven by logistics, power/fuel, and staffing (~$77.0M/yr).
🏗️ One-Time Capital Costs Total: $416.5M
Emergency Contingency Reserve $200.0M
[#14] Rapid-evacuation / global contingency fund minimum reserve to respond to large-scale or civilization-level events.
Facilities $120.0M
[#1] Construction/retrofit of a hardened South Pole research/containment complex, inner vaults, living quarters and cold-regions structural upgrades.
Containment Hardware $20.0M
[#6] Hardened inner vaults, Faraday/ontological shielding enclosures, safes and physical dampening hardware.
Initial Research And Lab Setup $16.0M
[#7, #17] High-performance computing and lab buildout (HPC cluster, cryogenics, secure experimental rigs) and initial protocol R&D.
Vehicles And Heavy Lift Purchase $12.0M
[#5] One-time purchase of snowcats, tracked vehicles, helicopters and heavy-lift ground vehicles for South Pole operations.
Long Term Reestablishment Minimum $10.0M
[#15] Minimal long-term civilization re-establishment caches (seed banks, archives, portable fabrication minimum cache).
Insurance Reserve $10.0M
[#20] Insurance/indemnity/litigation reserve against collateral damages or contractor claims.
Diesel Infrastructure Capital $6.0M
[#2] Diesel generator farm and fuel handling infrastructure (capital, tanks, on-site distribution).
Decommissioning Reserve $5.0M
[#12] Reserve for future decommissioning, site restoration and hazardous material removal in accordance with Antarctic protocols.
Comms And Backup Setup $3.0M
[#8] Satellite uplinks, redundant comms hardware, secure backup appliances and initial off-site replication setup.
Specialized Materials And Robotics $3.0M
[#18] Exotic shielding materials, custom sensors, robotics and bespoke instrumentation capital costs.
Monitoring Network Setup $3.0M
[#21] Distributed sensor deployment, sentinel hardware and initial monitoring partnerships to detect global ontological propagation.
Memetic Mitigation Setup $2.0M
[#9] Initial memetic/infoshazard mitigation technology, filters, protocol tooling and legal/ethical systems setup.
Security Initial Equipment $1.5M
[#4] Initial equipment and training for security & rapid response teams (weapons containment, memetic-safe training kits).
Medical Setup $1.5M
[#10] On-site clinic, quarantine/isolation rooms, emergency surgery capability and medevac readiness setup.
Archives One Time $1.5M
[#16] Hardened offline archives, physical backups and distributed redundancy setup.
Shutdown Hardware And Key Escrow $1.0M
[#22] Remote kill-switch hardware, secure offline key escrow and related fail-safe hardware.
Legal And Cover Setup $500K
[#11] Initial legal/diplomatic compliance, permits, and cover-story establishment costs.
Recruitment Setup $500K
[#19] Initial recruitment, vetting infrastructure, clearance processing and trust-account setup.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $77.0M/yr
Logistics And Transport $30.0M/yr
[#5] Annual airlift, heavy-lift charters, sea support, seasonal resupplies and transport for personnel/equipment to/from Antarctica.
Power Fuel And Transport $15.0M/yr
[#2] Annual diesel fuel, seasonal refueling flights and transport logistics for generator-based power option.
Staff Wages $13.1M/yr
[#3, #4] Core operational staff (researchers, engineers, IT, medical, logistics) and on-site security/response teams; loaded costs incl. Antarctic premiums and rotation overhead.
Supplies And Consumables $4.0M/yr
[#13] Food, heating fuel for buildings (non-generator fuel), sanitation, spare parts and routine replacement items.
Research And Monitoring $4.0M/yr
[#7, #17, #21] Ongoing lab support and maintenance, scheduled testing and red-team operations, and monitoring-network operations.
Facilities Maintenance $3.0M/yr
[#1] Yearly cold-regions structural maintenance, HVAC/heating upkeep, and site upkeep for 24/7 polar operation.
Cover Story And Legal $3.0M/yr
[#11] Ongoing diplomatic costs, permits, public affairs, classified access control and legal defense / data suppression efforts.
Memetic Program Operations $1.5M/yr
[#9] Ongoing training, psych evaluations, memetic filter maintenance, and monitoring for info-hazards.
Medical Operations And Medevac $1.5M/yr
[#10] Clinic operations, medical supplies, telemedicine contracts and medevac standby costs.
Comms And Data Replication $800K/yr
[#8] Bandwidth, satellite lease, encrypted comms maintenance and off-site replication transportation (couriers).
Environmental Compliance $800K/yr
[#12] Ongoing environmental monitoring, waste handling, spill prevention and compliance with Antarctic environmental protocols.
Recruitment And Vetting $300K/yr
[#19] Ongoing background checks, psychometric testing, clearance renewals and hazard-pay/rotation incentives.
Cost Scenarios
📊 Baseline (baseline) $77.0M/yr
88.0% probability / year
Normal year with no major incidents; operations run with diesel power and planned maintenance/operations only.
routine_operations scheduled_resupply no_major_incident
🚨 Minor Incident $87.0M/yr
8.0% probability / year +$10.0M vs baseline
Localized containment hardware failure or power outage requiring emergency repairs, replacement parts and extra charters.
localized_containment_failure equipment_malfunction short_term_power_loss
🚨 Major Breach $577.0M/yr
2.0% probability / year +$500.0M vs baseline
Significant containment breach or ontological propagation event requiring large-scale evacuation, remediation and reconstruction.
containment_breach ontological_propagation large_scale_evacuations
🚨 Smr Deployment $1.1B/yr
2.0% probability / year +$1.0B vs baseline
Decision to replace diesel infrastructure with a small modular reactor (rapid capital upgrade) to reduce logistics footprint long-term.
strategic_energy_investment logistics_cost_reduction_decision
👥 Personnel 105 total
Role Count Notes
Research Scientist 25 [#3, #7] Linguists, cognitive scientists, ontologists, AI researchers supporting interrogation and concept modeling.
Engineer / Maintenance 15 [#3, #6] Containment engineers and site maintenance, responsible for cold-regions infrastructure and shielding upkeep.
IT / Systems Engineer 8 [#3, #7, #8] HPC, telemetry, secure backups and communications maintenance.
Medical Officer 4 [#10] On-site medical staff managing clinic operations, medevac readiness and psychological care.
Logistics & Supply / Pilots 8 [#5] Personnel handling airlift, heavy-lift coordination, resupply and on-site material handling.
Administrative Staff 4 [#11, #19] Administrative, legal liaison, permit management and personnel administration.
Security Officer / MTF Agent 35 [#4] Armed/security personnel, rapid response, custody teams and memetic-safe protocol trained agents.
Site Director / Executive Staff 1 [#1, #11] Overall site leadership, diplomatic and authorization liaison.
Red-team / Containment Specialists 5 [#17] Independent testing and protocol development teams for safe interrogation and failure-mode analysis.
📋 Confidence Notes
Estimates are based on wide ranges in analyst notes and a high degree of uncertainty about SCP-9111's hazard profile (unknown object class, potential civilization-scale risks). Many costs (e.g., SMR deployment, emergency contingency sizing) are scenario-dependent and therefore have low confidence.
← SCP-9110 ↑ All SCPs SCP-9112 →