SCP-9177 Euclid ~ medium confidence
SCP-9177
Expected annual
$1.6M
One-time setup
$1.6M
Annual recurring
$1.5M
Personnel
9
Baseline one-time capital needs are dominated by containment cell modifications, a communal chamber, and a modest lab/equipment buildout; recurring costs are driven primarily by staff wages (researchers and security), D-class program overhead, and legal/admin/contingency expenses.
🏗️ One-Time Capital Costs Total: $1.6M
Bsl3 Upgrade Conditional $1.0M
[#28] Conditional: BSL-3 upgrade (one-time). Included as conditional capital (estimate midpoint ~$1,000,000).
Incident Response Reserve $200K
[#16] One-time contingency/reserve for incident response equipment and rapid-response fund.
Facilities $177K
[#1, #2, #3, #17] Cell modifications for seven humanoid cells, secure communal meditation chamber refurbishment, apiary enclosure and bee skep installation, and decontamination system (showers, installation).
Initial Research And Lab Setup $90K
[#11, #13] Medical monitoring & mortuary capability one-time equipment (~$50,000) and specialized research equipment (microscopes, freezers, PCR, ~$40,000).
Equipment $68K
[#5, #6, #9, #19, #22, #23] CCTV/active monitoring installation and DVR/storage ($10,000), backup power/UPS hardware ($30,000), hazmat/full-body suits purchase ($20,000), data-management/dev/setup ($5,000), translation/recording equipment ($2,000), spare bee skeps & mounts ($1,500).
Training Initial $10K
[#18] Initial staff training on escort protocol and incident procedures.
Data Management Setup $5K
[#19] One-time dev/setup for digital mapping, secure logging and backups (included here as discrete IT/dev cost).
Cultural Accommodations One Time $2K
[#27] Small capital purchases for permitted cultural/religious items (robes, books, artifacts).
Replacement Skeps One Time $2K
[#23] Spare skeps & mounts for specimen replacement/handling accidents.
Marking And Records Setup $500
[#4] One-time setup for color-coded bio-safe marking system, physical file, and digital mapping system.
🔄 Annual Recurring Costs Total: $1.5M/yr
Staff Wages $600K/yr
[#7, #8] Level-2 researcher staffing (3 FTE, ~$300k/yr) and security personnel (6 FTE, ~$300k/yr).
D Class Program $250K/yr
[#10] D-class procurement, housing, escorts, medical screening and admin (includes cost of one D-class per conversion event as scoped).
Research And Monitoring $160K/yr
[#11, #12, #14, #15] Medical monitoring consumables (~$10,000/yr), entomology/pathology assays and sequencing (~$50,000/yr), linguistics/historical research (~$40,000/yr), psych care/behavioural monitoring (~$60,000/yr).
Contingency $139K/yr
[#30] Misc & contingency: 10% contingency on recurring subtotal prior to contingency (applied to recurring subtotal as scoped).
Admin Overhead $128K/yr
[#25] Administrative and site allocation (approx. 15% chargeback on direct staff costs).
Cover Story And Legal $100K/yr
[#24] Litigation/cover-story/legal retainer and PR contingency.
Incident Response Fund $50K/yr
[#16] Annual contingency replenishment for rapid-response overtime, breach equipment and emergency measures.
Containment Insurance $50K/yr
[#29] Annual allocation for special incident liability and mitigation funds.
Logistics And Transport $15K/yr
[#26] Secure transport of SCP-9177-1 instances, D-class movement, samples to external labs and related logistics.
Supplies And Consumables $14K/yr
[#9, #17, #20, #23] PPE consumables & cleaning (~$3,000/yr), hazardous-waste disposal/consumables (~$10,000/yr), small consumables (markers, tags) ~$1,000/yr, replacement skeps minimal recurring ~$200/yr.
Energy Uplift $12K/yr
[#21] Incremental electricity for environmental control, cameras, freezers and monitoring.
Training And Drills $5K/yr
[#18] Annual refresher drills and escort procedure rehearsals.
Facilities Maintenance $3K/yr
[#6] Backup power/UPS maintenance, fuel/exercises and minimal facilities upkeep for critical systems.
Data Management Hosting $2K/yr
[#19] Hosting, backups, and software license maintenance for secure logging and mapping.
Cctv Storage And Maintenance $2K/yr
[#5] Video storage, encryption maintenance and minor camera upkeep.
Translation Licenses $1K/yr
[#22] Recurring translation software/licenses and minor recording upkeep.
Marking And Records Replacement $500/yr
[#4] Recurring replacement supplies for bio-safe markers, durable tags, and record upkeep.
Cultural Accommodations Recurring $500/yr
[#27] Small annual replacement budget for robes and permitted ritual materials.
Replacement Skeps Recurring $200/yr
[#23] Minimal recurring budget for specimen conservation materials and small replacements.
Bsl3 Upgrade Operations Conditional $0/yr
[#28] Conditional recurring ops (NOT included in baseline recurring). If activated, expected additional operations cost ~$150k–$300k/yr (midpoint ~$225,000/yr).
Cost Scenarios
📊 Baseline (baseline) $1.5M/yr
89.0% probability / year
Normal, uneventful year with routine operations and no major incidents or conditional upgrades.
routine_containment scheduled_maintenance weekly_meditation_sessions
🚨 Minor Incident $1.6M/yr
8.0% probability / year +$60K vs baseline
Single SCP-9177-A conversion/escort event or small staff incident requiring overtime, testing, and minor repairs.
single_conversion_event overtime_and_temp_repairs
🚨 Bsl Upgrade $2.8M/yr
2.0% probability / year +$1.2M vs baseline
Research determines BSL-3 is required; one-time lab upgrade is executed and higher annual operations commence.
evidence_of_transmissible_biological_agent decision_to_perform_active_bio-experiments
🚨 Major Breach $2.0M/yr
1.0% probability / year +$500K vs baseline
Containment breach or high-profile incident requiring large-scale emergency response, legal costs, and potential external mitigation.
breach_or_exposure civilian_injury_or_exposure
👥 Personnel 9 total
Role Count Notes
Research Scientist 3 [#7] Level-2 researcher staffing (3 FTE) required to cover meditation sessions and monitoring; wages included in staff_wages.
Security Officer / MTF Agent 6 [#8] Security rotational coverage (6 FTE) for escorts, meditation sessions, and containment shifts; wages included in staff_wages.
📋 Confidence Notes
Estimates are order-of-magnitude and based on provided analyst notes tied to existing humanoid containment site; conditional items (BSL-3 upgrade) are uncertain and staff/admin allocations are approximated, so medium confidence is appropriate.
← SCP-9173 ↑ All SCPs SCP-9179 →