SCP-921
Euclid
~
medium confidence
SCP-921
Expected annual
$4.2M
One-time setup
$14.3M
Annual recurring
$4.2M
Personnel
25
Initial capital outlay is approximately $14.3M driven by underground site construction, power/utility and specialized equipment; annual operating costs are about $4.16M driven primarily by staff wages, security/cover operations, utilities and logistics.
One-Time Capital Costs
Total: $14.3M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal year with routine operations and no major incidents.
regular staffing and maintenance
scheduled research activities
🚨
Minor Incident
$4.3M/yr
Small containment-related incident (injury, minor equipment failure, localized remediation).
on-site injury requiring medevac
equipment damage or small legal/settlement expense
🚨
Anomalous Expansion
$5.7M/yr
New wing/rooms appear requiring emergency reinforcement, containment expansion and rapid build-out.
appearance of new rooms/wings
urgent reinforcement and additional mapping/containment
🚨
Major Breach
$7.2M/yr
Significant containment breach or exposed incident requiring large-scale remediation, legal payouts and reconstruction.
structural collapse or major unauthorized exposure
multi-day remediation and legal exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#7] Patrol agents disguised as forest service performing continuous area sweeps and internal security rotations. |
| Research Scientist | 6 | [#8, #21] Senior researchers and psychologists/neuroscientists conducting studies and experiments. |
| Technician / Lab Technician | 6 | [#8, #11, #12] Lab techs, mapping/drone operators and equipment technicians supporting research and monitoring. |
| Site Director / Executive Staff | 1 | [#8] Site Director with special authorization for SCP-921-2 oversight. |
| Medical Officer | 1 | [#9, #15] Onsite physician/EMT on-call and medical coordination for medevac/rescue. |
| Administrative Staff | 1 | [#25, #28] Archive, cataloging and administrative support for naming, records and logistics. |
Confidence Notes
Analyst notes provide detailed ranges for nearly every line item, enabling mid-point estimates; uncertainty remains due to unpredictable anomalous expansion frequency, off-grid power decisions, and contingent/legal exposures.