SCP-9225
Unknown
?
low confidence
SCP-9225
Expected annual
$64.0M
One-time setup
$62.0M
Annual recurring
$50.1M
Personnel
168
Estimated one-time setup costs are roughly $62M for a lean baseline posture (lab buildout, sensors, initial R&D and reserves); recurring annual costs are ~ $50.1M driven mainly by staff wages, facility upkeep, mnestic supply/distribution, and maritime/air logistics. Major cost drivers are mnestic production/distribution and persistent maritime/air assets.
One-Time Capital Costs
Total: $62.0M
Annual Recurring Costs
Total: $50.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$50.1M/yr
Lean, uneventful year using leased vessels/aircraft, low mnestic unit cost, minimal forward base footprint and routine operations.
routine_patrols
scheduled_research
no_major_incidents
🚨
Minor Incident
$52.1M/yr
Localized equipment loss or small memetic leak requiring replacement/response but no wider exposure.
vessel_loss
small_memetic_leak
equipment_failure
🚨
High Mnestic Costs
$300.0M/yr
Manufacturing/potency crisis or supply-chain failure pushes mnestic unit cost to the high end, driving annual mnestic spend very large.
manufacturing_failure
supply_chain_disruption
mnestic_unit_price_spike
🚨
Major Breach
$150.1M/yr
Large-scale memetic exposure or major security breach requiring wide emergency response, replacement of multiple assets, major diplomatic payments and large-scale remediation.
mass_memetic_leak
civilian_exposure
major_breach_of_security
Personnel
168 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 120 | [#5] Field security force baseline (100–200 personnel); count chosen near lower-middle of analyst range to match wage budget. |
| Research Scientist | 30 | [#4] Noöspherics/memetics and allied researchers (30–80); baseline lower bound used to control recurring salaries. |
| Medical Officer | 8 | [#3] Psychiatrists, toxicologists and medics (6–12 specialists) included in medical staffing and monitoring budget. |
| Administrative Staff | 10 | [#28] Logistics, admin, rotation coordination and support staff included in personnel and living costs. |
Confidence Notes
Estimates are low-confidence due to very wide ranges in mnestic unit costs, multiple alternative posture options (lease vs purchase) and anomalous behavior; many line items (mnestic production, maritime posture) dominate and are highly scenario-dependent.