SCP-926
Safe
~
medium confidence
SCP-926
Expected annual
$4.2M
One-time setup
$38.0M
Annual recurring
$3.7M
Personnel
32
One-time program costs (excavation, secure warehousing, civil engineering) can drive total upfront spending into the tens of millions; baseline annual operations (security, research, conservation, facilities) are roughly $3.74M/year. Major excavation or large-scale recovery would produce very large one-year spikes in spending.
One-Time Capital Costs
Total: $38.0M
Annual Recurring Costs
Total: $3.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.7M/yr
Normal, uneventful year with standard containment, conservation, research and facility maintenance only.
routine operations
scheduled research
no excavations or major incidents
🚨
Minor Incident
$4.7M/yr
Localized discovery or targeted limited excavation requiring short-term field teams, emergency response and limited conservation throughput.
targeted excavation
localized statue activation
emergency mitigation
🚨
Major Recovery
$37.7M/yr
Full-scale program to locate, excavate, recover and secure thousands of responsive statues including large civil-engineering measures and warehousing.
mandated full recovery
large-scale excavation
major civil works / dam mitigation
🚨
Political Exposure
$5.7M/yr
Public leak or diplomatic incident requiring substantial legal reparations, covert payments, fines and accelerated mitigation.
public disclosure
diplomatic dispute
large-scale civil claims
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#3] Approximately 6 guards plus 1 supervisor on rotating shifts; included in staff wages. |
| Research Scientist | 4 | [#7] Archaeologist, musicologist, linguist/transcriptionist, historian — multidisciplinary research team; included in staff wages. |
| Conservator | 1 | [#5] Full-time conservator responsible for routine maintenance and condition reports; wage portion included in staff wages. |
| Cataloguing & Conservation Staff | 20 | [#22] Medium-sized cataloguing/conservation team for long-term processing of recovered statue corpus; staffing costs included in research_and_monitoring recurring line. |
Confidence Notes
Many line items are estimated from wide ranges (especially excavation, warehousing and civil engineering). Containment and recurring staffing costs are better defined; scenarios involving full corpus recovery have high uncertainty.