SCP-929
Euclid
~
medium confidence
SCP-929
Expected annual
$918K
One-time setup
$678K
Annual recurring
$865K
Personnel
8
One-time startup costs are roughly $678k driven by containment construction (tanks and sealed chamber), life-support and HVAC installations, and equipment. Recurring annual costs are about $865k driven primarily by staff wages (security and animal-care), ongoing research, veterinary care, and facilities maintenance.
One-Time Capital Costs
Total: $678K
Annual Recurring Costs
Total: $865K/yr
Cost Scenarios
📊
Baseline
(baseline)
$865K/yr
Normal, uneventful year with steady operations, routine maintenance, and no significant incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$895K/yr
Small-scale incident such as parent mortality, veterinary emergency, or localized equipment failure requiring repairs and emergency veterinary care.
parent_mortality
minor_containment_repair
veterinary_emergency
🚨
Major Breach
$1.4M/yr
Containment breach or aggressive episode (similar to Incident 929-1) causing casualties, large cleanup, legal exposure, medical costs, and major repairs.
hostile_engagement
containment_breach
parent_organisms_attack
🚨
Major Research Project
$1.1M/yr
Year in which research ramps up significantly, requiring additional hires, equipment purchases, and possibly facility upgrades.
expanded_funding
scale_up_research
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#10] 24/7 guard coverage across shifts; salary estimates include benefits and overtime assumptions used in staff_wages. |
| Animal Technician | 2 | [#11] One senior aquatic/avian tech and one support technician to perform daily feeding, water checks, and care. |
| Engineer / Maintenance | 1 | [#25] On-call/site maintenance engineer for life-support, HVAC and structural inspections. |
| Administrative Staff | 1 | [#22] Administrative/clerical support for permits, scheduling, and record-keeping. |
Confidence Notes
Estimates are based on analyst-provided ranges mapped to categories and mid-point selections; many items (contingency, contingency contribution, staffing mixes, frequency of transfers/incidents) are uncertain so a medium confidence is appropriate.