SCP-9389
Safe
~
medium confidence
SCP-9389
Expected annual
$836K
One-time setup
$570K
Annual recurring
$827K
Personnel
11
One-time setup is approximately $570k driven by property acquisition/renovation, contingency, and cryptanalysis/equipment purchases. Recurring annual costs are about $827k, dominated by personnel (guards, director, researchers) and site/security operations.
One-Time Capital Costs
Total: $570K
Annual Recurring Costs
Total: $827K/yr
Cost Scenarios
📊
Baseline
(baseline)
$827K/yr
Normal year with standard operations, no major incidents: routine research, maintenance, and staffing.
steady operations
no unauthorized access
no major research escalations
🚨
Minor Incident
$852K/yr
Small unauthorized access attempt, sensor tampering, or hardware failure requiring repairs and modest legal/PR action.
attempted break-in
hardware replacement
local PR/compensation payment
🚨
Research Breakthrough Requiring Scale Up
$1.0M/yr
Discovery necessitates a funded, multi-month cryptanalysis push and expanded compute/resources (on-prem GPU cluster, external consultants).
promising decryption breakthrough
external consultant engagement
on-prem compute procurement
🚨
Major Breach
$977K/yr
Significant containment failure or exposure (data leak, multiple unauthorized accesses) requiring urgent remediation, legal action, and restoration.
data exposure
coordinated unauthorized access
municipal/legal escalation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#4] 24/7 on-site guard rotation approximated as 4–6 FTE; estimate uses 5 FTE. |
| Research Scientist | 3 | [#5] 2–3 researchers for anomaly analysis. |
| Site Director / Executive Staff | 1 | [#5] Senior researcher / site director role (single). |
| IT / Forensics Specialist | 1 | [#5, #6] Responsible for legacy JOSIE hardware, air-gapped workstations, and forensic handling. |
| Security Liaison | 1 | [#5] Single security liaison coordinating with regional security and local authorities. |
Confidence Notes
Estimates are grounded in concrete, mundane line items (property, security, staff) so mid-level confidence; major uncertainties remain around cryptanalysis scope, whether property is purchased versus leased, and contingency needs which create wide cost ranges.