SCP-9517
Unknown
?
low confidence
SCP-9517
Expected annual
$49.4M
One-time setup
$532.0M
Annual recurring
$46.5M
Personnel
21
One-time capital/setup and contingency costs are dominated by covert censor insertion, optional space-telescope commissioning, and reserve/insurance funds (~$0.53B one-time). Recurring annual operations (monitoring, censor maintenance, personnel, legal/covert funding) run in the low tens of millions (~$46.5M/yr).
One-Time Capital Costs
Total: $532.0M
Annual Recurring Costs
Total: $46.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$46.5M/yr
Normal year with scheduled monitoring, maintenance, and no major public incidents.
routine_monitoring
scheduled_maintenance
🚨
Minor Incident
$51.5M/yr
Localized leak or publication requiring rapid legal/PR response and moderate remediation.
leak_paper_published
minor_breach_of_sensor_logs
🚨
Major Incident
$76.5M/yr
Widespread exposure or multi-jurisdictional litigation requiring large legal, political, and covert expenditure.
high_profile_publication
multi-jurisdictional_legal_action
🚨
Space Mission Commissioning
$396.5M/yr
Ground censorship proves insufficient and a mission-class response (small dedicated space telescope) is commissioned urgently.
failure_of_ground_censorship
global_exposure_risk
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 8 | [#9] Senior astrophysicists/cosmologists dedicated to measurement, modeling, and publication monitoring. |
| Postdoctoral Researcher | 4 | [#9] Junior research staff supporting modeling and data analysis. |
| Engineer / Maintenance | 6 | [#10] Instrument engineers, telescope operators, and lab technicians. |
| IT / Sysadmin | 2 | [#7, #8] HPC/grid operators and secure enclave administrators. |
| Administrative Staff | 1 | [#10] Procurement, contracts, and program administration. |
Confidence Notes
Estimates are low-confidence due to wide ranges in analyst notes, covert/cyber operations uncertainty, geopolitical variability, and optional high-cost contingencies (space missions, large reserves). Many cost items are intentionally obfuscated and contingent on external actors.