SCP-9564
Unknown
~
medium confidence
SCP-9564
Expected annual
$1.4M
One-time setup
$2.1M
Annual recurring
$1.4M
Personnel
13
Total one-time setup and remediation costs are estimated at $2,107,000 driven by perimeter works, site stabilization, equipment procurement and a large contingency; annual recurring operating costs are estimated at $1,396,000 driven primarily by personnel (security, research, medical) and UAV/transport operations.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with active containment operations and no major incidents; recurring operational tempo maintained.
planned_containment_window
routine_operations
no_major_incidents
🚨
Minor Incident
$1.5M/yr
Localized incident (equipment damage, small medical evacuation, targeted legal/PR response).
equipment_damage
medical_evacuations
temporary_public_attention
🚨
Major Breach
$2.6M/yr
Significant containment failure or public breach requiring excavation, large-scale remediation, extended operations and legal action.
breach_into_public
widespread_media_coverage
mass_evacuation
🚨
Political Exposure
$1.7M/yr
Leak or social-media-driven exposure causing municipal inquiry and extended legal/PR response without physical breach.
social_media_leak
municipal_inquiry
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#8] Eight guards to provide 24/7 coverage across three shifts; costed as loaded annual salaries in staff_wages. |
| Research Scientist | 4 | [#12] Four researchers/technicians for physics/geomatics/archaeology and data analysis; included in research salaries in staff_wages. |
| Medical Officer | 1 | [#11] One on-site medic/EMT contract included in staff_wages (monthly contract). |
Confidence Notes
Many line items and midpoints are provided in analyst notes (improves confidence), but assumptions were made when annualizing short-term monthly burns and treating some active-window costs as year-round; terrain, permitting uncertainty and contingent excavation risk add variability.