SCP-9714
Unknown
~
medium confidence
SCP-9714
Expected annual
$80.5M
One-time setup
$261.1M
Annual recurring
$80.5M
Personnel
120
One-time capital procurement (sensor network, KIP/suppression hardware, strategic reserve) drives upfront costs (~$233M); recurring staffing, Code Broadway readiness, maintenance and contingency reserves dominate annual spending (~$64.1M/year).
One-Time Capital Costs
Total: $261.1M
Annual Recurring Costs
Total: $80.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$80.5M/yr
Uneventful year with steady-state monitoring, maintenance, staffing, and standing program overhead only.
no major materializations in populated areas
routine maintenance and scheduled deployments only
🚨
Minor Incident
$64.4M/yr
Remote or small-scale materialization requiring immediate perimeter establishment and short deployment of KIP/dampeners; limited public exposure.
small remote materialization
single short-duration deployment of emitters and transport
🚨
Major Metro Event
$94.1M/yr
Materialization within a major metropolitan area triggering full Code Broadway activation, prolonged dampener operation, large infrastructure remediation and extended MTF operations.
materialization in high-density population center
extended dampener activation and mass amnestic deployment
🚨
Catastrophic Breach
$264.1M/yr
Prolonged containment failure or sustained activation in major population centers requiring national-scale suppression, reconstruction, and drawdown of strategic reserves.
prolonged activation across multiple sites
major infrastructure collapse or prolonged public exposure
Personnel
120 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 50 | [#9] Rapid-Response MTF (Epsilon-7) full-time tactical and support personnel. |
| Monitoring Station Operators / Signal Analysts | 30 | [#4] Continuous staffing for Stations 23-RA and 64-US (12–18 per station; staffed for 24/7 operations). |
| Research Scientist / Data Scientist / ML Engineer | 10 | [#13] Site-89 Department of Statistical Prediction staff (modeling, ML, geophysics). |
| Research Technician / Lab Staff | 10 | [#16, #15] Ongoing R&D and lab experiment staff supporting materials science and diagnostics. |
| Engineer / Maintenance | 6 | [#8, #6] Field engineering and maintenance crews for emitters, sensor nodes and deployable kits. |
| Administrative Staff | 8 | [#25] Administrative, compliance, classified recordkeeping and budget oversight staff. |
| Medical Officer / AMT | 4 | [#9, #28] Medical/AMT personnel embedded in rapid-response teams and public health response. |
| Site Director / Executive Staff | 2 | [#12, #25] Executive oversight for Site-89 operations and cross-program coordination. |
Confidence Notes
Estimates use midpoints of wide ranges supplied in analyst notes; per-event costs and event frequencies for a mobile, sporadic anomaly are highly uncertain, and political/operational choices (reserve size, purchase vs charter) strongly affect totals.