SCP-977
Euclid
~
medium confidence
SCP-977
Expected annual
$1.6M
One-time setup
$3.0M
Annual recurring
$1.6M
Personnel
13
Initial establishment and containment fit-out are estimated at $3,020,000 (one-time), with recurring annual operations of $1,574,000 driven primarily by personnel, data storage/backup, utilities/maintenance, and legal/cover operations. The largest single-line one-time exposures are property acquisition, remediation/renovation, and a contingency reserve for exploratory/structural escalation.
One-Time Capital Costs
Total: $3.0M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with routine operations and no major incidents.
routine_operations
no_incidents
🚨
Minor Incident
$1.6M/yr
Localized containment incident or personnel disorientation requiring search, medical response and overtime.
personnel_disorientation
short_search_and_medical_response
🚨
Tech Failure
$1.7M/yr
Major server/storage failure or data corruption requiring replacement, restoration, and contracted forensic recovery.
storage_failure
forensic_recovery
🚨
Excavation Required
$3.1M/yr
Discovery that anomalous rooms extend beyond known footprint requiring major excavation, underpinning or structural remediation.
discovery_of_extended_anomalous_space
structural_excavation
🚨
Political Exposure
$1.9M/yr
Public discovery or regulatory/legal escalation requiring heavy legal defense, settlements and intensified cover operations.
public_discovery
regulatory_investigation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#12] 24/7 coverage: 2guards/shift × 3 shifts (6 FTE), salaries and benefits included in staff_wages. |
| Site Director / Executive Staff | 1 | [#13] Dedicated site director (Level 4 equivalent) salary included in staff_wages. |
| Research Scientist / Technician | 4 | [#13] Research team to run experiments, monitor console and review footage; salaries included in staff_wages. |
| Data Analyst / Image Analyst | 2 | [#14] Analysts for facial comparison, indexing and triage; salaries included in staff_wages. |
Confidence Notes
Individual line items are based on analyst estimates and common contractor pricing; personnel and routine operations are well-specified but major unknowns (extent of anomalous spaces, required excavation, long-term evolution of containment needs) create material uncertainty, so confidence is medium.