SCP-980
Safe
~
medium confidence
SCP-980
Expected annual
$6.6M
One-time setup
$17.3M
Annual recurring
$6.4M
Personnel
27
Estimated one-time setup and capital costs are approximately $17.25M driven by vault construction, contingency reserves, initial recovery/remediation, and initial R&D/cover-up surges. Recurring annual costs are approximately $6.38M/yr driven by staff wages, long-term research and monitoring, sacrificial viewing panes and sensors, hazardous-waste disposal, and legal/cover operations.
One-Time Capital Costs
Total: $17.3M
Annual Recurring Costs
Total: $6.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.4M/yr
Normal year with routine testing, scheduled replacements, and no major incidents.
scheduled pane/sensor replacement
routine maintenance
planned research activity
🚨
Minor Incident
$6.8M/yr
Localized containment incident or accelerated degradation requiring extra disposals, replacement of multiple sacrificial components, temporary overtime staffing and small-scale remediation.
clustered pane/sensor failures
minor contamination event
short emergency response mobilization
🚨
Major Breach
$12.2M/yr
Significant containment failure or localized breach requiring extensive remediation, replacement of core containment elements, mass medical responses, and large-scale cover operations.
structural failure or extended exposure
mass-casualty medical response
large-scale remediation and relocation
🚨
Political Exposure
$8.9M/yr
Public exposure or legal/political discovery forcing extensive legal defense, large-scale cover payments, and public-facing remediation.
media leak or public discovery
legal action/official inquiry
large compensation/settlement demands
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] Perimeter and site security staffing (estimated midpoint of 8–16 guards). |
| Research Scientist / Technician | 12 | [#9] Core research, remote operators, technicians and maintenance staff (midpoint of 8–15 FTEs). |
| Medical Officer | 3 | [#11] On-call surgeons, pathologists, EMTs and medical support staff (small team to cover shifts). |
Confidence Notes
Notes provide detailed line-item ranges and realistic cost drivers, enabling a mid-confidence estimate. Uncertainty remains due to wide input ranges, anomalous behavior of SCP-980 (unpredictable equipment degradation), and variability in legal/cover-up exposure.