SCP-9800 Unknown ~ medium confidence
SCP-9800
Expected annual
$3.9M
One-time setup
$5.2M
Annual recurring
$3.5M
Personnel
27
Initial one-time setup is estimated at approximately $5.21M driven by perimeter/outpost build, equipment (generators, pumps, vehicles, field lab) and an escalation/reserve fund; recurring annual costs are ~ $3.54M/yr driven by staff wages (security + R&D), logistics, and ongoing monitoring.
🏗️ One-Time Capital Costs Total: $5.2M
Equipment $1.2M
[#4, #6, #8, #9, #10, #12, #17] Generators, initial vehicles/boats (partial), industrial pumps, sensor suites, drones, PPE/decon stations, and comms terminal purchases.
Escalation Reserve $1.0M
[#26] Immediate contingency/escalation reserve to begin scale-up engineering or response in case of rapid anomaly expansion.
Facilities $900K
[#1, #3] Site perimeter, access control barriers, gates, signage and initial modular outpost/site-prep work.
Long Term Remediation Reserve $500K
[#21] Seed funding/reserve for long-term environmental remediation planning and early contracts if soil/hydrology restoration required at scale.
Vehicles And Heavy Equipment Purchase $400K
[#6, #7] Purchase/rental buyouts for workboats, 4x4s/ATVs and a week(s)-scale heavy-equipment mobilization (excavator/pumps) to support containment works.
Initial Research And Lab Setup $350K
[#11, #13] Portable wet lab, initial analytical instruments, cold-chain sample storage and mobile autoclave/Biosecurity equipment for initial testing.
Decommissioning And Site Closure $200K
[#29] Provision for future dismantling of modular units, hazardous-material disposal and initial closure planning.
Agriculture Buyout Reserve $200K
[#22] Initial reserve for limited farmer buyouts, compensation or emergency remediation of nearby plots if contamination is detected.
Legal Pr And Compensation Initial $150K
[#19] Initial cover-story PR, legal retainers, up-front landowner compensation and permit fees.
Search And Recovery One Time $150K
[#15] One-time multi-week SAR and forensic recovery mobilization (helicopter hours / dive teams / specialized retrieval).
Archive And Document Infra $60K
[#25] Climate-controlled archival / vault infrastructure and secure media for recovered Site-618 archives.
Isolation Module $60K
[#16] Quarantine/isolation module purchase and setup for suspected contagion or contaminated personnel.
Recruitment And Clearance Initial $40K
[#27] Initial background checks, polygraphs and clearance processing for specialist hires required to staff the outpost.
🔄 Annual Recurring Costs Total: $3.5M/yr
Staff Wages $1.8M/yr
[#2, #14, #16, #23, #27] Security teams (round-the-clock armed guards & patrols), dedicated R&D/field scientists, on-site medic, rotation/overtime and mental-health services; includes clearance/onboarding amortization.
Facilities Maintenance $300K/yr
[#4, #5, #13, #25] Generator maintenance and fuel-system upkeep, water/sanitation system servicing, autoclave/incinerator servicing, and climate control for archives.
Supplies And Consumables $300K/yr
[#5, #12, #28, #11] Potable water deliveries, hazardous waste disposal contracts, PPE replacement and laundering, reagents and routine lab disposables.
Research And Monitoring $250K/yr
[#9, #11, #22] Environmental sensor networks, ongoing sample analysis (field and HQ referrals), crop/water testing and data telemetry costs.
Logistics And Transport $250K/yr
[#6, #10, #15, #18] Vehicle/boat maintenance and fuel, periodic aerial surveys/helicopter hours, resupply trips and search/recovery readiness posture.
Cover Story And Legal $200K/yr
[#19] Ongoing liaison with local authorities, media management, legal retainer, compensation flows and permit renewals to sustain the sinkhole narrative.
Insurance And Contingency Premiums $150K/yr
[#24] Annual liability, spill-response insurance and insurance-loading for remote/hazard operations.
Long Term Remediation Fund $100K/yr
[#21] Ongoing funding line for multi-year remediation and restoration programs (amortized contract payments).
Local Contractors $80K/yr
[#20] Seasonal/local labor contracts and civil works contractors for vegetation removal and civil maintenance.
Agriculture Monitoring $60K/yr
[#22] Regular testing and surveillance of nearby farms and supply-chain sampling; occasional buyout/compensation flows anticipated separately.
Psychological Support $40K/yr
[#23] Counseling and rotation-related support for personnel; approximates $200–500/yr per staff plus rotation travel overhead.
Archive Storage And Backup $8K/yr
[#25] Off-site secure backups, cold-storage media refresh and digital archival maintenance for recovered Site-618 research.
Cost Scenarios
📊 Baseline (baseline) $3.5M/yr
87.7% probability / year
Normal operational year with no major incidents: steady-state monitoring, routine research, resupply and standard staffing.
no breach routine monitoring scheduled resupply and rotations
🚨 Minor Incident $3.8M/yr
10.0% probability / year +$250K vs baseline
Limited containment breach or localized anomalous spread requiring short-term surge: overtime, short SAR, extra sampling and repairs.
localized spread small breach short-term SAR/recovery
🚨 Major Breach $8.5M/yr
2.0% probability / year +$5.0M vs baseline
Significant containment failure requiring large engineering response (extended pump/dyke works), broad remediation contracts, mass logistics and legal actions.
widespread hydrological failure large-area anomalous spread multi-week engineering mobilization
🚨 Catastrophic Escalation $78.5M/yr
0.3% probability / year +$75.0M vs baseline
Anomaly expands to agricultural/regional scale requiring mass relocation, multi-year remediation and national-level engineering programs.
persistent uncontrollable spread regional agricultural contamination multi-year national remediation needed
👥 Personnel 27 total
Role Count Notes
Security Officer / MTF Agent 12 24/7 armed guard teams, patrols and marine/boat watch; staffing level approximates an 8–12 guard core with rotations.
Research Scientist 8 Field and HQ-linked scientists (ecology, hydrology, molecular, anomaly specialists) conducting ongoing R&D and monitoring.
Engineer / Maintenance 3 Engineers and heavy-equipment technicians for pumps, power, structural stabilization and vehicle maintenance.
Medical Officer 1 On-site medic/medical coordinator with medevac liaison for emergencies and quarantine oversight.
Administrative Staff 2 Logistics, procurement, records and cover-story coordination.
Site Director / Executive Staff 1 Senior lead (e.g. acting director) responsible for operational decisions, external liaison and chain-of-command.
📋 Confidence Notes
Estimates are order-of-magnitude based on analyst ranges and a presumed remote Site-618 footprint; many line items have wide bounds (equipment scale, area affected, and escalation outcomes), so medium confidence is appropriate.
← SCP-9799 ↑ All SCPs SCP-9801 →