SCP-9811
Unknown
?
low confidence
SCP-9811
Expected annual
$2.5M
One-time setup
$4.0M
Annual recurring
$2.5M
Personnel
17
Initial one-time setup is approximately $4.0M driven by property acquisition, specialized memetics lab buildout, vehicles/robotics and contingency reserves; annual operating costs are ~ $2.02M/yr driven by staff wages (security and scientific/memetic staff), rapid-response readiness, and ongoing R&D.
One-Time Capital Costs
Total: $4.0M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with no major incidents: routine operations, scheduled research, and normal maintenance.
no breaches
steady research pace
routine maintenance
🚨
Minor Incident
$2.2M/yr
Localized memetic exposure event, small breach or artifact damage requiring MTF deployment, limited legal action, and emergency repairs.
small containment breach
limited public exposure
MTF deployment & legal settlements
🚨
Major Breach
$3.2M/yr
Significant containment failure or memetic cascade requiring extended emergency response, major repairs, replacement of equipment, heavy legal/PR action, and ramped R&D.
large-scale breach
widespread memetic exposure
political/media exposure requiring large settlements
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#5] Six full-time on-site guards (3 shifts × 2) plus one supervisor as per security staffing estimate. |
| Research Scientist (Memetics) | 3 | [#13] Memeticists/psychologists required for memetic testing and countermeasure development; recurring program staffing. |
| Research Scientist (Curator / Conservator / Lab Tech) | 4 | [#16] Curators, conservators, and lab technicians to catalog, preserve, and handle exhibits (restricted access). |
| Engineer / Maintenance | 1 | [#18, #24, #25] Facilities engineer/maintenance lead for HVAC, emergency power, and routine maintenance of a specialized museum. |
| Administrative Staff | 2 | [#3, #11, #32] Admin/public-affairs/IT support to maintain front organization, secure communications, and handle overhead/retention administration. |
Confidence Notes
Significant uncertainty driven by memetic hazard, site-specific property pricing, and the open-ended nature of staff-entrance R&D; many items are range estimates and contingent on operational posture (observe-only vs. aggressive R&D).