SCP-982
Safe
~
medium confidence
SCP-982
Expected annual
$3.4M
One-time setup
$3.5M
Annual recurring
$3.4M
Personnel
24
[#26] Estimated one-time capital/setup costs ~$3,460,000 driven primarily by BSL-3/decontamination fit-out, specialized containment chamber construction, and initial R&D/contingency funds; expected baseline recurring operating costs are ~$3,363,750/yr driven by staff wages, expendable-equipment losses, and ongoing medical/research/support budgets.
One-Time Capital Costs
Total: $3.5M
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Normal uneventful year with standard mission cadence and no major incidents.
regular_missions
routine_maintenance
no_major_incidents
🚨
Minor Incident
$3.6M/yr
Localized incident (lost equipment or single-team contamination) requiring emergency retrieval, medical response and limited replacement of assets.
equipment_lost_to_reset
localized_contamination
team_member_medical_evacuations
🚨
Major Breach
$4.9M/yr
Significant containment failure or multi-person loss requiring extended emergency response, large-scale decontamination, legal costs and accelerated research/mitigation.
containment_breach
mass_contamination
loss_of_multiple_assets_and_personnel
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#7] 24/7 armed guard coverage; multiple guards per shift. |
| Security Supervisor / MTF Agent | 1 | [#7] On-site supervisory role for guard operations. |
| Field Specialist (medic/historian/linguist/hazmat/etc.) | 12 | [#8] Dedicated ~12-person exploration/mission roster covering required specialties. |
| Medical Officer | 1 | [#11] On-call infectious disease specialist/medical oversight for screening and quarantine. |
| Telegraph Operator / Communications Specialist | 1 | [#16] Operator/transcriber to manage period-communication interface and telegram routing. |
| Engineer / Maintenance | 1 | [#5, #18] Responsible for generator/UPS/HVAC and actuator/lock maintenance and calibration. |
Confidence Notes
Estimates are derived from detailed containment and operational notes (medium confidence) but many items use broad order-of-magnitude ranges (construction regional variance, mission cadence, expendable losses and R&D uncertainty) so figures should be treated as indicative rather than precise.