SCP-9889
Neutralized
~
medium confidence
SCP-9889
Expected annual
$1.1M
One-time setup
$3.6M
Annual recurring
$1.1M
Personnel
14
First-year (one-time + one year recurring) costs are driven by heavy recovery/transport, containment pad and structural work, and possible lab/BSL upgrades; recurring costs are dominated by security and research staffing plus HVAC/energy and waste treatment. Estimated one-time buildout ~ $3.64M and annual carrying cost ~ $1.08M.
One-Time Capital Costs
Total: $3.6M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; routine monitoring, staffing, utilities and waste management only.
no incidents
routine monitoring
standard staffing levels
🚨
Minor Incident
$1.1M/yr
Small-scale decomposition event or localized leak requiring emergency response, short-term overtime, extra waste disposal and limited remediation.
localized gas/leachate release
minor contamination requiring cleanup
🚨
Major Breach
$1.6M/yr
Significant containment failure or unexpected reactivation leading to evacuation, major repairs, decontamination and legal/PR costs.
structural failure
large gas buildup or fire
unexpected biological activity
🚨
Disposal Operation
$1.9M/yr
Deliberate decision to dispose of the remaining mass (full incineration/immurement) in a single year, incurring large one-off disposal and transport costs in addition to ongoing operations.
policy decision to incinerate
regulatory/legal mandate to remove mass
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#11] 24/7 perimeter and access control staffing (armed guards or MTF agents) to meet coverage described in analyst notes. |
| Research Scientist | 3 | [#12] Pathologists, parasitologists, structural/biological specialists conducting analyses and monitoring. |
| Technician / Lab Technician | 1 | [#12, #13] Necropsy and sample-prep technician support for large-sample processing and analytics. |
| Engineer / Maintenance | 1 | [#6, #7, #9] Facilities/HVAC/structural maintenance and on-call engineering support for containment systems. |
| Administrative Staff | 1 | [#19, #22] Administrative/records-management support for sample chain-of-custody, legal liaison and cover operations. |
Confidence Notes
Medium confidence: physical dimensions, staffing needs and containment hardware are well constrained, but composition uncertainty (asphalt-like vs organic), hazardous classification and whether full BSL upgrades or mass incineration are required produce wide cost ranges.