SCP-9892
Safe
✓
high confidence
SCP-9892
Expected annual
$590K
One-time setup
$1.3M
Annual recurring
$581K
Personnel
5
Upfront one-time costs are dominated by property acquisition, incident-response reserves, and IT integration (~$1.33M); recurring annual costs are driven by staff wages (Banshee engineers, reviewers, analyst) plus ongoing compute, research, security, and legal (~$0.58M/yr).
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $581K/yr
Cost Scenarios
📊
Baseline
(baseline)
$581K/yr
Normal year with purchased property, standard monitoring, Banshee operations, and routine research; no major incidents.
routine_operations
no_breach
steady_infection_metrics
🚨
Minor Incident
$606K/yr
Localized incident (break-in, theft, small spike in SCP-9892-1) requiring local response, minor replacements, short surge contractors and PR retainer activation.
local_break-in
theft_of_tools
small_spike_in_digital_infections
🚨
Major Breach
$1.3M/yr
Significant digital propagation or large-scale corruption event requiring global remediation: surge hiring, emergency compute, extended contractor ops, travel, and use of escalation reserve.
rapid_infection_growth
public_exposure
Banshee_failure_or_false_negatives
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Site Custodian / Owner | 1 | [#3] Dylan Molson hired in a limited role to maintain SCP-9892; salary/benefits accounted (~$48k/yr). |
| Research Scientist / ML Engineer | 2 | [#11] Banshee ongoing maintenance and engineering (1–2 FTEs -> ~$180k/yr total). |
| Content Moderator / Reviewer | 1 | [#13] Ongoing manual review and reconciliation (~$75k/yr). |
| Analyst / Reporting | 1 | [#24] KPI/monitoring analyst (0.25–0.5 FTE, budgeted ~$25k/yr; represented as 1 headcount for coverage). |
Confidence Notes
Analyst notes provide line-item estimates for nearly every cost driver (purchase vs lease, Banshee one-time and recurring, research, security, legal). Numbers are midrange estimates; main uncertainties are chosen midpoints for ranges and scenario probabilities, but overall cost structure is well-defined.