SCP-9923
Unknown
?
low confidence
SCP-9923
Expected annual
$5.7M
One-time setup
$10.1M
Annual recurring
$5.5M
Personnel
29
Initial one-time setup is estimated at roughly $10.1M driven by secure facilities, compute, and R&D; annual recurring operations are ~ $5.48M/yr driven by staff wages, security, legal/mitigation, and ongoing monitoring/ops.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $5.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.5M/yr
Normal year with no major public incidents; routine operations, monitoring, and scheduled R&D.
no public leaks
only scheduled research and ops
🚨
Minor Incident
$6.5M/yr
Localized leak or limited memetic exposure requiring surge response, extra legal takedowns, clinical care, and accelerated remediation.
localized platform leak
small-scale staff exposure
limited public reposting
🚨
Major Breach
$13.5M/yr
Significant uncontrolled spread into public virtual spaces or mass cognitive effect requiring large-scale remediation, legal action, emergency care, and program scale-up.
widespread virality on major platforms
mass exposures requiring hospitalization
major legal/political escalation
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 5 | [#5] Senior and mid-level memetic/information-hazard researchers (2 senior + 3 mid as example). |
| Lab Technician | 2 | [#5] Lab techs supporting experiments and instrumentation. |
| IT / Sysadmin / Forensic Analyst | 4 | [#6] Sysadmins, DevSecOps, and forensic analysts for air-gapped compute and logging. |
| Security Officer / MTF Agent | 10 | [#7] Physical security coverage (8–12 guards + supervisors). |
| Medical Officer | 3 | [#8] Psychiatrists, therapists, and clinical monitoring staff for exposed personnel and subjects. |
| Administrative Staff | 2 | [#25] Program admin, contracting, compliance and auditing support. |
| Site Director / Executive Staff | 1 | [#25] Program director / executive oversight. |
| Engineer / Maintenance | 2 | [#1, #3] Facility/EM/shielding and HVAC/compute maintenance engineers. |
Confidence Notes
Estimates are order-of-magnitude and the object is highly conceptual/memetic with uncertain failure modes; article is intentionally surreal and incomplete, so cost drivers and incident probabilities are speculative.