SCP-9955
Uncontained
~
medium confidence
SCP-9955
Expected annual
$8.0M
One-time setup
$12.9M
Annual recurring
$7.8M
Personnel
14
Initial capital build and secure observatory/retrofit costs are substantial (~$12.93M one-time) driven by radio array/facility construction and secure containment retrofit; recurring annual operations are dominated by staff, site operations, monitoring, R&D and legal/cover operations (~$7.83M/year).
One-Time Capital Costs
Total: $12.9M
Annual Recurring Costs
Total: $7.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.8M/yr
Normal operational year with continuous monitoring, routine R&D and no major incidents.
continuous_monitoring
routine_research
no_major_incidents
🚨
Minor Incident
$8.3M/yr
Localized emergent host or short-lived psionic event requiring emergency deployment, additional containment and legal/PR response.
emergent_host_detection
short_field_deployment
targeted_legal/PR_response
🚨
Major Breach
$12.8M/yr
Significant containment failure or high-profile exposure requiring large-scale containment, replacement infrastructure and extended legal/liability response.
widespread_psionic_exposure
multi-host_containment
major_public_exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#4] PI/site lead responsible for program oversight and coordination with Theurgic Company and executive decisions. |
| Research Scientist (Radio Astronomer) | 3 | [#4, #3] Senior scientists operating radio monitoring, analysis and guiding research agenda. |
| Signal Processing Engineer / Data Scientist | 4 | [#4, #2, #3] Staff implementing real-time signal processing, anomaly detection pipelines and data analysis. |
| Operations Technician / Observatory Tech | 3 | [#1, #3, #11] Technicians maintaining antennas, cryogenic LNAs, mounts, and HPC/UPS systems; on-site operations and routine maintenance. |
| Security Officer / MTF Agent | 2 | [#9, #14] Rapid-response/security personnel for field containment missions and site security; liaison for legal/OPSEC enforcement. |
| Administrative Staff | 1 | [#5, #6, #16] Admin and program management supporting vetting processes, contracts, cover story logistics and coordination. |
Confidence Notes
Analyst notes provide broad ranges and multiple viable operational models (lease vs build, depth of GOI cooperation, degree of staffed southern presence). Estimates choose mid-range assumptions; significant uncertainty remains in incident frequency/severity and choice between leasing and capital build.