SCP-9968
Skótos1
~
medium confidence
SCP-9968
Expected annual
$9.6M
One-time setup
$6.9M
Annual recurring
$9.4M
Personnel
73
One-time capital of roughly $6.88M driven by facility retrofits, habitat construction and specialized equipment; recurring annual costs ~ $9.45M/yr driven primarily by staff wages, research & monitoring, energy/operations and waste-disposal.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $9.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.4M/yr
Normal operational year with no major incidents; routine maintenance, staffing and research continue.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$9.9M/yr
Localized containment breach or frequent small escapes (e.g., Eden escape events) requiring emergency response, repairs and overtime.
small_escape
localized_cleanup
temporary_repairs
🚨
Major Breach
$14.4M/yr
Significant containment breach with public exposure/environmental release requiring large-scale remediation, replacements and legal actions.
large_breach
public_exposure
major_remediation
Personnel
73 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#9] 12 guards per site × 3 sites for 24/7 coverage as specified. |
| Animal Handler / Animal-Care Technician | 30 | [#10] 10 handlers/techs per site × 3 sites. |
| Veterinary Staff | 3 | [#11] Full-time veterinarians (3). |
| Veterinary Technician | 4 | [#11] Vet techs (4) supporting clinical supplies and care. |
Confidence Notes
Notes are detailed and provide line-item estimates for each category, enabling a medium confidence in totals; ranges and several optional choices (e.g., on-site incinerator) introduce uncertainty and lead to mid-point selections.