SCP-9978
Keter
~
medium confidence
SCP-9978
Expected annual
$145.0M
One-time setup
$2.3B
Annual recurring
$84.0M
Personnel
90
One-time capital of approximately $2.34B driven by equipment purchases (satellite/interceptor programs), deep-space intercept capability and a large contingency reserve; recurring annual costs of about $84M driven primarily by embedded liaison personnel, Site-234 staff, ongoing research/BSL-4 operations and containment-readiness.
One-Time Capital Costs
Total: $2.3B
Annual Recurring Costs
Total: $84.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$84.0M/yr
Normal year with ongoing monitoring, Site-234 operations, research and readiness; no major breach or large-scale interventions.
no major meteorite impacts
routine monitoring and research only
🚨
Minor Incident
$114.0M/yr
Localized impact in a remote area requiring rapid retrieval, small regional lockdown and limited culling/remediation.
remote/low-population meteorite impact
rapid-response retrieval and localized lockdown
🚨
Major Breach
$684.0M/yr
Moderately populated region impacted; large-scale lockdown, mass culling, mass cremation, extensive remediation and major cover-up/compensation required.
moderately populated area impact
extended lockdown and mass-remediation
🚨
Catastrophic Breach
$5.1B/yr
Highly populated or cross-border catastrophic event requiring nationwide/multinational lockdowns, mass fatalities management, and very large-scale remediation and political suppression.
high-population/cross-border impact
nation-scale lockdowns and mass-casualty operations
Personnel
90 total
| Role | Count | Notes |
|---|---|---|
| Embedded Liaison / MTF Agent | 60 | [#1] Trusted operatives embedded at major national space agencies and private launch firms (monitoring missions and telemetry). Count estimated from 40–80 embeds; midpoint used. |
| Site-234 Staff (Security / Medical / Containment / Caretakers) | 30 | [#5] 24/7 guarded staffing, containment specialists, clinical staff and small research team to manage SCP-9978-1; analyst estimate 20–50 FTEs used. |
Confidence Notes
Analyst notes provide granular line-item ranges and clear drivers, enabling a structured estimate, but many costs are highly event-driven and span multi-order-of-magnitude ranges (particularly per-event lockdown/culling/compensation and deep-space programs). This yields moderate confidence.