SCP-003
Euclid
~
medium confidence
SCP-003
Expected annual
$7.3M
One-time setup
$129.2M
Annual recurring
$7.2M
Personnel
18
One-time capital/setup costs are dominated by hardened underground construction and a large contingency reserve (~$129M total one-time). Recurring annual costs center on personnel, research, security, energy and emergency readiness (~$7.16M/yr baseline).
One-Time Capital Costs
Total: $129.2M
Annual Recurring Costs
Total: $7.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.2M/yr
Normal uneventful year with routine operations, maintenance and scheduled research.
no containment incidents
steady-state research operations
🚨
Minor Incident
$7.7M/yr
Small localized growth episode or equipment failure requiring cleanup, modest repairs and staff overtime.
localized growth episode
equipment failure requiring on-site remediation
🚨
Major Breach
$10.2M/yr
Containment breach with personnel exposure, observation-gallery intrusion and significant infrastructure repairs and PR/legal costs.
breach into observation gallery
multiple-personnel exposure requiring extended response
🚨
Catastrophic Breach
$57.2M/yr
Severe large-scale activation with potential for mass alteration requiring wide-area mitigation and use of contingency reserve.
sustained power loss + large-scale contact with complex organisms
failed initial containment response
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] Six security staff as per containment staffing model to provide 24/7 armed response and perimeter control. |
| Research Scientist | 6 | [#11, #16] Six researchers (M03-Gloria style) running experiments, analysis and monitoring. |
| Technician / Engineer | 4 | [#7, #2, #22] Four technicians for equipment, HVAC, power and robotics maintenance. |
| Site Manager / Executive Staff | 2 | [#11, #28] Two site managers/directors overseeing operations, oversight liaison and program administration. |
Confidence Notes
Article and analyst notes provide detailed operational drivers and a staffing model (improves confidence), but many estimates require assumptions (R&D pacing, contingency sizing, incident frequency). Several high-uncertainty items (contingency reserve sizing, breach probabilities and long-term R&D costs) reduce overall confidence to medium.