SCP-006 Safe ~ medium confidence
SCP-006
Expected annual
$10.6M
One-time setup
$20.6M
Annual recurring
$10.4M
Personnel
33
Large one-time capital including secure perimeter, lab build-out and a dedicated breach-response reserve (~$20.6M), with recurring annual costs driven by staffing (security + research), cover-story operations/legal, and ongoing research (~$10.43M/yr).
🏗️ One-Time Capital Costs Total: $20.6M
Breach Response Fund $10.0M
[#21] Contingency reserve for containment-breach response, buyouts, mass remediation and PR (recommended fund).
Initial Research And Lab Setup $3.2M
[#10, #11] On-site wet-lab build-out (BSL-2/3 gloveboxes, cold rooms, clean benches) and laboratory capital equipment (sequencers, flow cytometers, incubators, microscopes).
Cover Story Infrastructure $2.2M
[#16] Initial setup for the chemical-factory front: machinery, inventory, office fit-out and startup costs.
Facilities $1.8M
[#1] Harden remote site: perimeter fencing, vehicle barriers, guard towers, civil works and anti-tamper ground measures in remote Russian terrain.
Bnc Suits $550K
[#8] Procurement of modified Class VI BNC suits and initial spares (20–30 suits).
Incinerator Purchase $550K
[#15] High-capacity biohazard incinerator installation and ash-handling infrastructure.
Local Relations Initial $350K
[#17] Initial trust-building pool for local authorities, permits and facilitation payments.
Equipment $325K
[#2] On-site surveillance hardware: HD PTZ cameras, thermal imagers, vibration sensors, recorders and field network enclosures.
Armored Transport $300K
[#6] Purchase of armored vans/containers, radios, GPS and stowage for secure transfers.
Legal Structures Initial $225K
[#20] Initial legal / foreign-operations counsel setup and corporate front creation.
Generator Purchase $225K
[#23] Purchase of redundant diesel generator(s) and initial fuel storage hardware.
Sample Vault Initial $225K
[#31] Climate-controlled long-term sample vault and archival evidence management initial capital.
It Security Hardware $200K
[#18] Classified communications & IT hardware: hardened servers, Faraday cages and air-gap hardware.
Water Handling Initial $175K
[#24] Initial pumps, flow-control valves and tamper-resistant extraction hardware for the spring.
Spare Parts Initial $115K
[#28] Initial stockpile of spare parts for pumps, vehicles, PPE and lab equipment.
Transfer Containers $112K
[#7] Custom Quad-Sealant certified transport containers (recommended 10 units, with spares).
Background Investigations Initial $70K
[#19] Initial background investigations, security clearances and psychological screening setup.
🔄 Annual Recurring Costs Total: $10.4M/yr
Staff Wages $3.5M/yr
[#4, #13] Armed security personnel (18–24 guards, sergeants, commander) and scientific staffing (senior immunologists, molecular biologists, lab techs).
Cover Story And Legal $2.2M/yr
[#16, #17, #20, #29] Ongoing cover-factory operating costs (raw materials, payroll, utilities), local relations/facilitation, recurring legal counsel and public-facing PR maintenance.
Research And Monitoring $1.2M/yr
[#25, #26, #27] Environmental/wildlife monitoring, ethical oversight/O5 review admin, and baseline research trials budget.
Contingency Fund $900K/yr
[#32] Operating contingency (10–20% recommended of annual operating budget).
Supplies And Consumables $565K/yr
[#12, #28] Laboratory consumables and reagents; ongoing replenishment of spare parts and consumable logistics.
Special Response Unit $450K/yr
[#5] Rapid-reaction team wages, tactical equipment and monthly readiness training.
Energy $350K/yr
[#23] Fuel, generator maintenance and continuous power provisioning for remote site systems.
Surveillance Operations $275K/yr
[#3] 24/7 monitoring staff, encrypted off-site storage and periodic audits for surveillance data.
Medical Monitoring $275K/yr
[#14] Continuous occupational health surveillance, periodic testing, emergency medical care and quarantine readiness.
Logistics And Transport $265K/yr
[#22] Emergency air/ground transport contracts (helicopter medevac and rapid logistics retainer).
Background Investigations Recurring $115K/yr
[#19] Periodic rechecks, psychological screening and clearance maintenance.
Suit Maintenance $90K/yr
[#9] Immersion/testing pool maintenance, suit recertification, filters and repairs.
It Security Operations $90K/yr
[#18] Ongoing cyber operations, encryption, secure backups and maintenance of air-gapped systems.
Incinerator Operations $65K/yr
[#15] Operating costs and maintenance for the on-site biohazard incinerator.
Containment Training $65K/yr
[#30] Regular drills, Procedure 006-Xi-12 exercises and external tabletop simulations.
Sample Vault Maintenance $38K/yr
[#31] Climate-control, security and multi-site redundancy costs for archived samples.
Water Handling Maintenance $20K/yr
[#24] Ongoing maintenance for pumps, valves and flow meters to prevent unauthorized access.
Incineration Event Reserve $4K/yr
[#15] Per-incineration event costs (estimated expectation: one small event/year at midpoint $3.5k).
Facilities Maintenance $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $10.4M/yr
90.0% probability / year
Normal year with standard operations, scheduled research, routine maintenance and no major incidents.
routine_research scheduled_maintenance no_breach_or_public_exposure
🚨 Minor Incident $10.9M/yr
8.0% probability / year +$500K vs baseline
Localized containment event (small breach, limited exposure or transport incident) requiring response, repairs and PR.
localized_breach transport_incident limited_public_exposure
🚨 Major Breach $15.4M/yr
2.0% probability / year +$5.0M vs baseline
Significant compromise of secrecy requiring large-scale mobilization, use of breach-response reserve, extensive remediation and media management.
major_containment_breach widespread_public_exposure international_legal_action
👥 Personnel 33 total
Role Count Notes
Security Officer / MTF Agent 21 Primary 24/7 armed guard force (18–24 range) included in staff wages [#4].
Research Scientist / Lab Technician 12 Senior immunologists, molecular biologists and technical staff (6–12 range) included in staff wages [#13].
📋 Confidence Notes
Analyst notes are detailed with line-item ranges and canonical procedures, allowing midpoint estimates; however wide ranges (and the optional breach fund) introduce uncertainty, so confidence is medium.
← SCP-005 ↑ All SCPs SCP-007 →