SCP-008
Euclid
~
medium confidence
SCP-008
Expected annual
$23.7M
One-time setup
$221.1M
Annual recurring
$22.5M
Personnel
107
Per-site one-time construction and capital costs are dominant (~$221M) driven by hardened G2 facility construction and high-capacity decontamination/incineration; annual operating costs are substantial (~$22.5M/yr) driven by specialized personnel, ongoing research, containment maintenance, and stockpile custody.
One-Time Capital Costs
Total: $221.1M
Annual Recurring Costs
Total: $22.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$22.5M/yr
Normal operational year with no major incidents; routine containment, research, and maintenance only.
routine operations
no containment breach
🚨
Minor Incident
$24.5M/yr
Localized containment breach or limited contamination requiring targeted incineration, remediation, legal/PR response, and investigation.
localized containment breach
single infected escape
limited environmental contamination
🚨
Catastrophic Breach
$222.5M/yr
Major site loss or uncontrolled release requiring full incident response, site replacement, large-scale remediation, and diplomatic/black-op cover actions.
complete containment failure
site loss / political exposure
widespread contamination
Personnel
107 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 10 | [#8, #25] Senior researchers and prion specialists required for ongoing countermeasure development and validation; staffing included in research payroll estimate. |
| Lab Technician | 20 | [#8, #7] Technicians to run assays, maintain cold chain, and operate prion-dedicated instruments; included in research/lab wages. |
| Security Officer / MTF Agent | 60 | [#9, #15] 24/7 armed security and internal rapid-response containment teams; wage and equipment costs accounted under security payroll and security capital/maintenance. |
| Medical Officer | 5 | [#10, #11] On-site medics and infectious disease physicians for quarantine monitoring and emergency care; quarantine program costs handled separately. |
| Engineer / Maintenance | 4 | [#3, #4, #5] Engineers and maintenance staff for HVAC, generators, irradiator/incinerator, and facility systems maintenance. |
| Specialist disposal team | 3 | [#23] Teams trained and staffed to neutralize and transfer fully-infected subjects; staffing and equipment costs included in euthanasia-related budget. |
| Administrative Staff | 4 | [#21, #30] Administrative, legal liaison, and records personnel to manage cover stories, vetting, and archives. |
| Site Director / Executive Staff | 1 | [#8, #21] Executive oversight and liaison; included in overall payroll estimates. |
Confidence Notes
Analyst notes provide detailed ranges for nearly every line item enabling mid-range estimates, but many costs (SCP-500 acquisition, remediation extents, political/black-ops payouts, and catastrophic rebuilds) are highly uncertain, so confidence is medium.