SCP-009
Euclid
~
medium confidence
SCP-009
Expected annual
$4.9M
One-time setup
$16.3M
Annual recurring
$4.8M
Personnel
15
One-time capital costs are dominated by hardened facility construction, specialized cryo/vacuum equipment, and an emergency reserve; recurring annual costs are dominated by remediation retainer, insurance, continuous staffing, and an annual unknown-interaction research budget.
One-Time Capital Costs
Total: $16.3M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal year with steady operations, no containment incidents.
no incidents
regular maintenance
routine research
🚨
Minor Incident
$5.0M/yr
Localized containment excursion requiring on-site remediation, extra testing and limited downtime.
sensor/chiller failure
small quarantine breach
limited contaminated-material disposal
🚨
Major Breach
$6.8M/yr
Significant containment failure requiring multi-week remediation, external contractors, legal responses and higher disposal throughput.
multi-system failure
extended cooling/power loss
release to controlled site area
🚨
Catastrophic Breach
$29.8M/yr
Large-scale release into public environment (e.g., municipal water), requiring major remediation, long-term liability payments and potential litigation.
containment breach
contamination of public water
failure of multiple redundancies
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#18] 24/7 perimeter and site security (three-shift coverage). |
| Rapid-response hazmat team | 4 | [#18] On-call rapid response and hazmat operators (separate funded ops). |
| Research Scientist | 2 | [#19] Senior scientists to design and oversee experiments (wages included in staff_wages). |
| Lab Technician | 2 | [#19] Technicians for sample handling, routine assays and equipment support. |
| Continuous Monitoring Operator | 3 | [#21] 24/7 telemetry/CCTV/sensor monitoring (three shifts). |
| Engineer / Maintenance | 1 | [#20] FTE maintenance technician for HVAC/chillers/vacuum systems. |
| Site Director / Executive Staff | 1 | [#18, #19] Administrative oversight included in staff wage allocation. |
Confidence Notes
Analyst notes provide detailed itemized estimates (highly useful for capital and recurring budgeting), but substantial uncertainty remains around rare catastrophic scenarios, insurance availability, and site-dependent construction/utility costs.