SCP-057
Safe
~
medium confidence
SCP-057
Expected annual
$2.0M
One-time setup
$9.3M
Annual recurring
$2.0M
Personnel
13
One-time capital and construction costs are high (~$9.35M) driven by site excavation/stabilization and contingency/decommissioning; recurring annual costs are moderate (~$1.98M/year) driven by staff wages, research/monitoring, and redundant environmental/power systems.
One-Time Capital Costs
Total: $9.3M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal, uneventful year with routine operations and scheduled maintenance only.
routine_monitoring
scheduled_maintenance
no_incidents
🚨
Minor Incident
$2.1M/yr
Localized failure or test-loss (ROV/sensor loss), requiring replacements and short-term repairs.
ROV_destruction
sensor_suite_failure
minor_emergency_repairs
🚨
Major Breach
$3.0M/yr
Significant incident (unauthorized entry or catastrophic equipment failure) requiring emergency response, forensic investigation and repair.
unauthorized_entry
major_equipment_loss
large_repair_project
🚨
Political Exposure
$3.5M/yr
Public exposure or legal/political event forcing major cover-story expenditures, legal settlements, or relocation efforts.
media_exposure
local_government_discovery
legal_action
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#12] Principal research staff (Dr. Lewis/Dr. Walston equivalents). |
| Research Technician / Systems Engineer | 3 | [#13] Technical staff to operate sensors, ROVs and maintain systems (2–4 technicians; mid-range used). |
| Security Officer / MTF Agent | 4 | [#14] 24/7 minimal guard presence (3–4 guards); mid-range staffing selected. |
| Medical Officer | 2 | [#15] On-call medics/paramedics for authorized entries and trauma/psychological support. |
| Site Director / Administrative Staff | 2 | [#17] Site manager and administrative support handling approvals, HR and record-keeping. |
Confidence Notes
Costs are derived from analyst-provided ranges and a mid-range budgeting approach; containment and staffing levels are described in the article, but many capital and incident costs have wide ranges and site-specific variables, yielding medium confidence.