SCP-058
Keter
~
medium confidence
SCP-058
Expected annual
$10.3M
One-time setup
$186.9M
Annual recurring
$9.5M
Personnel
46
One-time build and fabrication for a heavily reinforced, heat-resistant containment shell plus specialized demolition provisioning dominate upfront costs (~$187M). Annual operations are driven by staffing, emergency response readiness, animal procurement, and repair/maintenance (~$9.5M/yr), with low-probability catastrophic events adding very large contingent costs.
One-Time Capital Costs
Total: $186.9M
Annual Recurring Costs
Total: $9.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.5M/yr
Normal operational year with routine maintenance, feedings, research and drills; no major incidents.
routine operations
no breaches
planned maintenance and research
🚨
Minor Incident
$9.7M/yr
Localized damage (camera/door/robot strike), short-term ERT deployment, increased medical and repair costs but containment maintained.
localized structural or equipment damage
short ERT response
increased repairs and overtime
🚨
Major Breach
$14.5M/yr
Significant containment breach requiring large-scale ERT response, site lockdown, major repairs and extended remediation; possible off-site damage.
major containment failure
prolonged ERT operations
extensive equipment and structural damage
🚨
Catastrophic Breach
$109.5M/yr
Containment failure leading to site-wide destruction, large-scale remediation, possible site decommissioning and legal/political fallout (conventional demolition or government-level response).
full containment failure
major structural collapse or widespread exposures
necessity of large-scale remediation/decommissioning
Personnel
46 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | Multi-shift armed guards to cover 24/7 operations (included in staff_wages). |
| Engineer / Maintenance | 8 | Specialized techs for containment systems, robotics servicing and scheduled maintenance (included in staff_wages). |
| Research Scientist | 6 | Scientists and lab technicians for ongoing research and pathology (included in staff_wages). |
| Emergency Response Team | 8 | Dedicated ERT members for breach response and drills (included in staff_wages). |
| Administrative Staff / Site Management | 2 | Site director and administrative support (included in staff_wages). |
| Medical Officer / Medics | 2 | On-site medics and emergency medical liaisons (included in staff_wages). |
| Audio Analyst / Listener Rotation | 4 | Rostered listeners and analysts to meet the 30-minute listening limit; personnel costs included in staff_wages. |
Confidence Notes
Containment specifications (wall thicknesses, maintenance cadence, feeding schedule) are explicit, allowing constrained capital estimates, but fabrication, site-specific construction, legal/cover costs and contingency items have large ranges leading to moderate uncertainty in final figures.