SCP-061
Safe
~
medium confidence
SCP-061
Expected annual
$3.1M
One-time setup
$661K
Annual recurring
$3.1M
Personnel
18
Initial capital/setup estimated at $661,000 driven by facility construction (sound isolation chamber, lockers) and specialized equipment (data diode, destruction gear). Annual operating costs are about $3.11M/year, driven primarily by staff wages, scientific research (imaging, subject care), security, replacement equipment and a contingency buffer.
One-Time Capital Costs
Total: $661K
Annual Recurring Costs
Total: $3.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.1M/yr
Normal, uneventful year with planned experiments and routine operations only.
routine_experiments
scheduled_maintenance
no_security_incidents
🚨
Minor Incident
$3.4M/yr
Localized containment incident (single experiment breach or equipment destruction) requiring emergency replacement, medical care, and legal/PR response.
single_experiment_breach
limited_equipment_destruction
minor_medical_treatment
🚨
Major Breach
$5.1M/yr
Significant containment failure or hostile breach during experimentation leading to multiple destroyed devices, mass medical response, legal/amnestic operations and heavy PR/legal costs.
perimeter_breach_during_experiment
mass_exposure_or_multiple_subjects_injured
public_exposure_requires_amnestics
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#12] Armed guards covering shifts (example staffing: 8guards). |
| Security Supervisor | 1 | [#12] Site-level security supervisor / lead. |
| Research Scientist (Neuroscientist) | 1 | [#13] Senior neuroscientist leading research. |
| Software Engineer | 2 | [#13] Developers/engineers for code analysis and safe tooling. |
| Audio Engineer | 1 | [#13] Specialist for acoustic delivery and playback systems. |
| Lab Technician | 2 | [#13] On-site technicians for experiments and device handling. |
| Medical Officer | 1 | [#14] Medical monitoring and emergency care during trials. |
| Engineer / Maintenance | 1 | [#20, #7] Facilities/AV/HVAC and secure equipment maintenance. |
| Administrative Staff | 1 | [#19] Recordkeeping, chain-of-custody administration and compliance. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, but several items require frequency assumptions (experiment count, destruction events, imaging hours) and midpoint estimates were used; contingency and scenario probabilities add further uncertainty.