SCP-062
Euclid
~
medium confidence
SCP-062
Expected annual
$962K
One-time setup
$540K
Annual recurring
$930K
Personnel
14
First-year one-time/setup costs are approximately $540,000 driven by containment construction, RF shielding, custom feedthroughs and contingency reserves; ongoing annual operations are about $929,500/year driven primarily by staff wages (security, forensic/analysis, and technical staff), plus maintenance, legal/cover and monitoring.
One-Time Capital Costs
Total: $540K
Annual Recurring Costs
Total: $930K/yr
Cost Scenarios
📊
Baseline
(baseline)
$930K/yr
Normal operational year with no major incidents; routine experiments, maintenance, and scheduled audits only.
routine_operations
scheduled_maintenance
planned_experiments
🚨
Minor Incident
$1.0M/yr
Localized containment incident or media contamination requiring emergency response, extra forensic analysis, limited legal/PR actions and media replacement.
media_contamination
limited_data_exfiltration
localized_hardware_damage
🚨
Major Breach
$1.5M/yr
Significant containment breach or widespread data/IT contamination that requires full incident mobilization, large-scale forensics, equipment replacement and extended legal/cover remediation.
major_data_leak
multiple_system_compromise
legal_exposure
🚨
Research Scaleup Requiring Procurement
$1.1M/yr
An opportunity or directive to scale up experiments (e.g., intensive analysis campaign) requiring rapid procurement of niche instruments, temporary contractors and expanded compute capacity.
intensive_experiment_campaign
rapid_procurement_of_specialists
external_directive_to_scale
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#9] Minimum two guards per shift plus rotation and one supervisor (6 guards + 1 supervisor as per analyst estimate). |
| Research Technician | 1 | [#10] One full-time technician to operate experiments and maintain the object (pro-rated L3 oversight costed separately). |
| Research Scientist (Level-3, oversight/shared) | 2 | [#10] Two Level-3 personnel required for approvals; oversight costs are pro-rated in staffing estimate (shared role across experiments). |
| Forensic / Analysis Team | 3 | [#11] Digital forensic analysts, linguists, cryptographers and memetic-safety reviewers (2–3 analysts plus contract specialists — modeled as 3 on-staff equivalents). |
| Administrative Staff | 1 | [#20] One administrative FTE for recordkeeping, approvals and chain-of-custody paperwork. |
Confidence Notes
Analyst notes provide granular line items for construction, equipment, staffing and contingencies, enabling a reasonable cost model; uncertainty remains due to the anomalous, variable nature of SCP-062's outputs (possible spike events, unpredictable contractor needs and legal exposure), so estimates include conservative buffers.