SCP-075
Euclid
~
medium confidence
SCP-075
Expected annual
$2.2M
One-time setup
$21.0M
Annual recurring
$2.2M
Personnel
16
Estimated one-time capital and contingency costs total about $21.03M, driven by chamber construction, corrosion‑hardened equipment, robotic handling and large remediation/insurance reserves; ongoing annual operating costs are roughly $2.21M/yr driven primarily by staff wages, HVAC/desiccant operation, consumables and legal/administrative overhead.
One-Time Capital Costs
Total: $21.0M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal uneventful year with no containment incidents; routine operations, maintenance, training and consumable replenishment.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$2.3M/yr
Small humidity excursion or limited secretion event requiring emergency desiccant deployment, minor repairs and consumable replacements.
humidity_excursion
desiccant_deployment
minor_material_damage
🚨
Major Breach
$2.7M/yr
Significant containment breach with substantial liner/equipment replacement, localized structural repairs, contractor remediation and legal response.
large_secretion_release
equipment_failure
localized_structure_damage
🚨
Catastrophic Breach
$12.2M/yr
Full containment failure requiring site remediation, demolition, environmental cleanup and invocation of contingency/insurance reserves.
structural_failure
widespread_corrosion
environmental_contamination
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#11] 24/7 armed cleared personnel coverage (three-shift rotation; count chosen consistent with wage total). |
| Containment Technician / Maintenance | 4 | [#12] Technicians for daily checks, HVAC/desiccant handling, liner replacements and maintenance (FTE count aligned with wage estimate). |
| Research Scientist | 2 | [#13] Restricted-study researchers/analysts for monitoring and permitted experiments (headcount aligned with wage estimate). |
Confidence Notes
Estimates derived from analyst-provided ranges using midpoint assumptions; hardware and staffing costs are reasonably well-constrained but contingency/reserve sizing and incident frequencies are highly uncertain, so confidence is medium.