SCP-1001
Unknown
~
medium confidence
SCP-1001
Expected annual
$2.8M
One-time setup
$5.5M
Annual recurring
$2.8M
Personnel
20
Initial capital outlay is estimated at $5,522,000 driven primarily by specialized construction (pit, greenhouse, acoustic shell) and integrated equipment (robotics, HVAC, sensors). Annual recurring operations are estimated at $2,755,500/yr, dominated by staff wages, legal/insurance, and ongoing research/maintenance.
One-Time Capital Costs
Total: $5.5M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with no major incidents; covers all recurring programs, staffing, supplies, and routine maintenance.
routine_operations
scheduled_research
annual_maintenance
🚨
Minor Incident
$2.8M/yr
Localized containment event requiring short shutdown, additional decontamination, incident response deployments, and extra testing/monitoring.
unexpected_mimicry_event
minor_contamination
temporary_shutdown
🚨
Major Breach
$4.3M/yr
Significant containment breach or escalation requiring emergency neutralization, relocation, large-scale remediation, and legal/PR response.
containment_breach
widespread_environmental_contamination
public_exposure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | On-site xenobotanist/xenobiochemist and senior research staff responsible for experimental design, feed trials, and mitigation research. [#14] |
| Research Technician / Lab Tech | 2 | Laboratory technicians handling sample prep, feed formulation, and supervised testing support. [#14, #21] |
| Site Engineer / Maintenance | 1 | Engineer responsible for facility systems (liners, HVAC, robotics maintenance). [#7, #1] |
| Security Officer / MTF Agent | 12 | Trained security cadre enforcing no-audio protocols, access control, and rapid response. Includes shift coverage and rapid-response capability. [#15] |
| Administrative Staff | 2 | Site administrative and liaison personnel handling permits, legal coordination, and scheduling. [#22, #23] |
Confidence Notes
Analyst notes provide detailed ranges and many line items; however substantial site-specific variance (local labor, energy rates, escalation risk) and uncertainty about breach probabilities and long-term R&D costs reduce confidence to medium.