SCP-1030
Euclid
~
medium confidence
SCP-1030
Expected annual
$1.1M
One-time setup
$966K
Annual recurring
$1.1M
Personnel
8
First-year capital costs are front-loaded (~$966.5k) for cell construction, incineration equipment, remote manipulators and research setup; recurring annual costs (~$1.115M/yr) are dominated by staff wages and a planning/response contingency reserve.
One-Time Capital Costs
Total: $966K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with routine operations, no major incidents; recurring costs only.
No breaches
Routine disposals and maintenance
Planned research and audits
🚨
Minor Incident
$1.1M/yr
Localized containment event: multiple SCP-1030-3 creations within containment requiring extra incinerations, overtime, and small repairs.
SCP-1030-3 animation inside cell
Extra incineration/disposal events
Temporary overtime and cleanup
🚨
Major Breach
$1.9M/yr
Significant breach event requiring rapid-response deployment, major repairs, medical treatment, legal/PR expenses and asset replacement.
SCP-1030-3 escape beyond containment
Injury/hospitalization
Extensive incineration and facility repairs
🚨
Catastrophic Breach
$3.6M/yr
Major public exposure or widespread hostile animation event triggering large-scale emergency response, litigation, and long-term remediation.
Public exposure
Multiple-site contamination
Extended mass-response and litigation
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#6] Four full-time guards to provide reliable 24/7 coverage (3 shifts + relief). |
| Security Technician / Monitoring Staff | 1 | [#7] One FTE electronic monitoring/technician with part-time backup for NVR, cameras and terminal systems. |
| Research Scientist | 3 | [#8] One containment lead (senior researcher) and two junior researchers/technicians for periodic study and experiment oversight. |
Confidence Notes
Analyst notes provided granular line items and ranges for most costs, enabling reasonable mid-point estimates; uncertainty remains in frequency of disposal events, scale of potential breaches, and choice between on-site vs contracted services, so confidence is medium.