SCP-1029
Safe
~
medium confidence
SCP-1029
Expected annual
$357K
One-time setup
$432K
Annual recurring
$350K
Personnel
2.55
Initial one-time setup is moderate (~$432,000) driven primarily by a targeted internal research program and secure hardware; annual recurring operations are estimated at ~$350,000/year driven by staff wages (analytical staffing and security), contracted analyses, monitoring, and legal/OPSEC activities.
One-Time Capital Costs
Total: $432K
Annual Recurring Costs
Total: $350K/yr
Cost Scenarios
📊
Baseline
(baseline)
$350K/yr
Normal year with no public exposure or major incidents; routine research, monitoring, and maintenance only.
no public leak
outsourced analyses
routine monitoring
🚨
Minor Incident
$390K/yr
Limited public exposure or discoverable leak requiring takedown, forensic tracing, targeted legal action and modest additional monitoring.
small-scale public repost
single-host resistant to takedown
need for targeted forensics and additional legal support
🚨
Major Breach
$850K/yr
Widespread public distribution or high-profile exposure requiring mass takedowns, expanded research, contingency response and significant legal/PR operations.
mass distribution
media coverage / public health concern
international hosts requiring legal action
Personnel
2.55 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Analytical Chemist) | 1 | Senior chemist responsible for experimental design, interpretation, and oversight. Salaries included in staff_wages [#8]. |
| Lab Technician | 1 | Technical sampling, equipment maintenance and routine analyses. Included in staff_wages [#8]. |
| IT Technician (FTE) | 0.05 | Part-time IT support for checksum verification and offline station maintenance (0.05 FTE). Costs captured in integrity_checks_it_maintenance [#3]. |
| Security Officer / MTF Agent (pro-rated) | 0.5 | Pro-rated security coverage for access control and occasional guard duties; costs included in staff_wages [#12]. |
Confidence Notes
Estimates are based on analyst-provided ranges and typical Foundation practices; major uncertainties include whether a GC-MS is purchased versus contracted, scale of potential public exposure, and staffing arrangements across sites.