Expected annual
$1.8M
One-time setup
$1.1M
Annual recurring
$1.7M
Personnel
8
One-time capital of approximately $1.11M for containment buildout, equipment, vehicles and initial investigations; recurring annual costs ~ $1.72M driven by staff wages, ongoing research/monitoring, legal/cover-story budgets and contingency reserves.
🏗️ One-Time Capital Costs Total: $1.1M
Equipment $566K
[#1, #4, #5, #11, #17, #26, #27, #28] Industrial desiccant dehumidifiers and HVAC integration, initial humidity/temperature/particle/CCTV sensors, vacuum-sealers / nitrogen cabinets / gloveboxes, two response vehicles and mobile command trailer, initial specialized tooling (diamond saws, core drills), backup generator, initial secure IT hardware, forklift/pallet equipment.
Investigation And Interdiction Initial $225K
[#23] Initial intelligence and investigation into manufacturer/origin (Apollodorus), legal work and interdiction startup costs (covert operations, legal filings).
Facilities $220K
[#1, #3, #19] Containment room construction and airtight/insulation upgrades, setup of dedicated low-hazard storage bays and concrete pads. Combines mid-range estimates for room retrofit, storage bay setup and associated installation work.
Initial Research And Lab Setup $70K
[#7] Laboratory analysis tranche (XRD, SEM, mass spec, hardness and mechanical testing, outsourced analyses) to characterize powder/resin matrix.
Training And Sop Development Initial $25K
[#24] Upfront SOP development, initial drills, Level-3 experiment approval process development and initial training program set-up.
Initial Ppe Purchase $7K
[#25] Initial purchase of respirators, full suits, gloves, decon materials and baseline occupational health program setup (one-time equipment outlay).
🔄 Annual Recurring Costs Total: $1.7M/yr
Staff Wages $510K/yr
[#9, #10] On-site security staff coverage and technical staff (1 Level-3 scientist + technicians). Mid-range aggregate of provided salary bands.
Contingency Reserve $300K/yr
[#20] Annual reserve allocation toward contingency / large-event response fund (to be available for major atypical events; mid-range of suggested reserve).
Cover Story And Legal $295K/yr
[#21, #29] Annual budget for municipal coordination, legal retainer, PR/cover-story costs and public-safety liaison/litigation handling (mid-range combined).
Extreme Escalation Reserve $200K/yr
[#30] Annual allocation toward low-probability, high-impact large-scale propagation events (multi-site evacuations, national-level response preparedness).
Research And Monitoring $174K/yr
[#4, #8, #19, #23, #27] Ongoing experimental program and materials testing, data storage/monitoring fees, long-term monitoring of stored material, ongoing investigative monitoring and secure hosting/audits.
Logistics And Transport $108K/yr
[#11, #12, #15, #16] Mobile response operational baseline (fuel, vehicle maintenance, UAV ops), baseline transport and occasional short-term heavy-equipment rentals averaged as annual operational logistics costs.
Per Incident Response Avg $70K/yr
[#13, #14, #15, #16, #18, #22] Annualized average for field perimeter materials, demolition/removal, rubble handling and transport, heavy-equipment rental, excavation spoil disposal and civilian compensation averaged assuming ~0.2 incidents/year (medium incident every ~5 years).
Facilities Maintenance $21K/yr
[#2] Continuous energy and maintenance for dehumidifiers/HVAC, periodic servicing and desiccant bed/filter replacements (mid-range of provided estimate).
Supplies And Consumables $17K/yr
[#6, #17, #25] Nitrogen refills, desiccant replacements, replacement vacuum-bags/wraps, blade/consumable wear for tooling, PPE replacement and medical surveillance (annual replacement costs).
Training And Drills $15K/yr
[#24] Recurring refresher training, drills and SOP exercise costs (annual).
Backup Power Fuel Testing $7K/yr
[#26] Annual fuel, testing and maintenance for backup generator sized to HVAC/load.
Cost Scenarios
📊 Baseline (baseline) $1.7M/yr
83.0% probability / year
Normal year with routine operations, no major field incidents beyond expected minor responses and planned research.
routine_monitoring scheduled_research no_major_field_activations
🚨 Minor Incident $2.1M/yr
15.0% probability / year +$350K vs baseline
Single medium-scale field activation requiring perimeter, demolition of a small/moderate SCP-1043-2, rubble removal and local evacuation.
single_site_activation localized_evacuations demolition_and_rubble_handling
🚨 Major Incident $4.2M/yr
2.0% probability / year +$2.5M vs baseline
Large urban activation or multiple activations requiring multi-day demolitions, large-scale evacuations and national-level asset mobilization.
multiple_activations urban_large_structure_demolition procedure_28-Surtur_invoked
👥 Personnel 8 total
Role Count Notes
Security Officer / MTF Agent 4 [#9] Four on-site security personnel providing 24/7 alarm response and periodic patrols (aggregate wages included in staff_wages).
Research Scientist 1 [#10] One Level-3 scientist overseeing experiments, approvals and incident technical decisions (salary included in staff_wages).
Technician / Lab Tech 3 [#10, #8] Laboratory technicians supporting experiments, monitoring, sample handling and field support (aggregate wages included in staff_wages).
📋 Confidence Notes
Large ranges in analyst estimates, uncertainty in number/distribution of sacks (text shows conflicting counts), and high variability of per-incident costs produce low confidence in precise figures; values use mid-range assumptions and an assumed incident frequency.