SCP-1047
Safe
~
medium confidence
SCP-1047
Expected annual
$2.0M
One-time setup
$3.3M
Annual recurring
$2.0M
Personnel
15
Initial one-time capital costs are estimated at approximately $3.33M driven by building purchase, specialized pumps, containment lockers/suppression systems, robotics and a multi-century endowment; steady-state annual recurring costs are about $1.97M/yr driven primarily by staff wages (security + research), emergency readiness and contingency reserves.
One-Time Capital Costs
Total: $3.3M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal uneventful year with scheduled operations, maintenance, staffing, and reserves; no major incidents.
steady_operations
scheduled_maintenance
🚨
Minor Incident
$2.1M/yr
Localized incident requiring decontamination, small structural repair, limited legal/cover-up actions and short-term disruption.
small_decontamination
localized_structural_damage
minor_legal_exposure
🚨
Major Breach
$3.0M/yr
Significant containment failure or activation causing large-scale decontamination, structural replacement, heavy legal exposure and potential public cover-up operations.
structural_collapse
large_scale_decontamination
public_exposure
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#14] Eight rotating guards for 24/7 coverage (per analyst note). |
| Site Supervisor / Security Supervisor | 1 | [#14] On-site supervisor and overtime management. |
| Research Scientist | 3 | [#18] Full-time containment-science staff (3 scientists). |
| Engineer / Maintenance | 3 | [#18] Full-time engineers/technicians (3) for pumps, HVAC and equipment O&M. |
Confidence Notes
Detailed analyst line items provide concrete estimates for most categories (building, pumps, lockers, staff), but long-term (473-year) assumptions, environmental/regulatory variance, and rare high-impact incidents introduce uncertainty.