SCP-1056
Safe
~
medium confidence
SCP-1056
Expected annual
$2.3M
One-time setup
$10.3M
Annual recurring
$2.3M
Personnel
13
One-time setup costs are approximately $10.3M driven primarily by containment infrastructure (blast/energy chamber, Level-2 facility, Class E storage) and a $2M contingency reserve; recurring annual costs are about $2.299M/yr driven by staff wages (security, research, medical), ongoing research/monitoring, and insurance/energy overhead.
One-Time Capital Costs
Total: $10.3M
Annual Recurring Costs
Total: $2.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.3M/yr
Normal operating year with no major decay incidents; ongoing research, containment, and routine maintenance only.
routine_testing
no_decay_events
standard_maintenance
🚨
Minor Incident
$2.5M/yr
Localized decay event affecting storage or a small experiment causing equipment damage, short-term medical care, and cleanup.
small_decay_in_ablative_storage
minor_equipment_damage
limited_medical_treatment
🚨
Major Breach
$3.8M/yr
Significant decay event or containment failure causing damage to test chamber or lab areas, multiple medical casualties, and major repairs/legal costs.
material_instability_within_36h
damage_to_test_chamber
multiple_treatments_and_repairs
🚨
Catastrophic Breach
$12.3M/yr
Rare catastrophic decay/energy release causing multi-million-dollar structural damage, prolonged public exposure response, and potential site relocation.
high-energy_decay_of_large_mass
structural_failure
public_exposure_and_military_response
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#2] 24/7 dedicated guards and supervisor to enforce access and shifts (7 personnel used in salary calc). |
| Research Scientist | 1 | [#18] Lead researcher (Level 3) included in research personnel costs. |
| Research Technician | 3 | [#18] Full-time research technicians included in research personnel costs. |
| Medical Officer / Nurse | 2 | [#11] On-call physician and nursing/monitoring staff for onsite medical monitoring and emergency care. |
Confidence Notes
Line-item estimates are based directly on analyst-provided figures where possible, but several large capital items and incident probabilities (decay frequency, magnitude of potential damage) are inherently uncertain; ranges were collapsed to medians for budgeting.