SCP-107
Safe
~
medium confidence
SCP-107
Expected annual
$17.2M
One-time setup
$263.2M
Annual recurring
$16.4M
Personnel
60
One-time setup dominated by remote land acquisition, perimeter/buildout and large contingency reserves (~$263M). Annual operating costs are driven by security, remote-site staffing and contingency/monitoring (~$16.4M/yr).
One-Time Capital Costs
Total: $263.2M
Annual Recurring Costs
Total: $16.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.4M/yr
Normal uneventful year with routine monitoring, scheduled moves and standard maintenance; no major activations escaping containment.
routine_operations
scheduled_transfers
no_unplanned_activation
🚨
Minor Incident
$16.6M/yr
Localized accidental activation or limited escape requiring targeted neutralization and short-term remediation.
localized_activation
small-scale neutralization
🚨
Major Incident
$26.4M/yr
Significant unauthorized activation or containment failure requiring large remediation within the research area and elevated legal/media handling.
unauthorized_activation
widespread_abnormal_growth_within_research_area
🚨
Catastrophic Breach
$116.4M/yr
Containment breach or experiment that causes precipitation effects to impact civilian areas, triggering major multi-agency remediation and large compensation/reserve drawdown.
escape_affecting_civilians
widespread_ecosystem_damage
🚨
Research Scale Up
$19.4M/yr
Planned intensive experimental program that increases operational tempo, staffing, and consumable usage for a year.
large_experimental_campaign
intentional_high-volume_tests
Personnel
60 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 46 | [#6, #13] Combined Site-19 guards and perimeter/patrol staff assigned to Research Area-06 and site response. |
| Research Scientist | 8 | [#17] Core research team (botanists, plant pathologists, atmospheric scientists, technicians). |
| Class-D Personnel | 4 | [#8] Rotational Class-D staff used for removal/experiments per procedures. |
| Administrative Staff | 2 | [#7] Administrative and authorization overhead for Level-4 approvals and recordkeeping. |
Confidence Notes
Midpoint estimates used for wide ranges (especially land acquisition and contingency reserves); many line items (remote land, contingency size, patrol staffing) are highly location- and policy-dependent, creating moderate uncertainty.