SCP-108
Safe
~
medium confidence
SCP-108
Expected annual
$2.6M
One-time setup
$12.6M
Annual recurring
$2.5M
Personnel
15
Initial one-time capital and modification costs are dominated by a potential portal-neutralization capital project and BSL-3 laboratory construction; baseline annual operating costs are driven mainly by staff wages (security, specialists, medical) and ongoing research/monitoring. Expected annual running costs (without one-off neutralization) are approximately $2.53M, with episodic incidents and neutralization attempts producing much larger single-year spikes.
One-Time Capital Costs
Total: $12.6M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with routine containment, scheduled exploration, and no major incidents.
routine_operations
scheduled_sampling
no_breach
🚨
Minor Incident
$2.7M/yr
Small containment event: one expulsion/loss of a single robot, minor contamination requiring extra forensics and medical treatment.
partial_expulsion
robot_loss
localized_contamination
🚨
Major Breach
$6.0M/yr
Significant containment breach or mass contamination event requiring broad medical response, extended BSL-3 operations, legal response and major remediation.
large_scale_expulsion
widespread_contamination
legal_exposure
🚨
Neutralization Project
$12.5M/yr
Decision/year in which command initiates a full neutralization/sealing R&D and demolition project to sever the portal.
policy_decision
neutralization_attempt
major_capital_project
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#3] ~9 guards (3 per shift × 3 shifts) at ~ $55k fully loaded each; incremental security cost. |
| Research Scientist / Specialist | 4 | [#16] 3–6 specialists recommended (robotics technicians, archaeologists, metallurgists); modeled here as 4 FTEs included in specialists budget. |
| Nurse / Medical Officer | 1 | [#4] 1 FTE nurse for daily examinations and routine medical care. |
| Physician (consultant) | 1 | [#4] Weekly physician oversight / specialist consults budgeted as consultant support. |
Confidence Notes
Containment and operational items (cell mods, ROVs, staff levels, HVAC/filters) are described in the source and allow moderate confidence; large items (BSL-3 construction, neutralization project, conservation per-part costs) are highly uncertain and introduce material variance, hence medium overall confidence.