SCP-1072
Safe
~
medium confidence
SCP-1072
Expected annual
$1.8M
One-time setup
$1.9M
Annual recurring
$1.8M
Personnel
6
One-time setup is approximately $1.94M driven by construction, robot/integration, contingency and legal/setup costs; recurring annual operations are approximately $1.78M/year driven by staff wages, medical/legal reserves, security and ongoing maintenance.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal uneventful year with routine operations, maintenance and planned reserves funded.
routine_operations
scheduled_maintenance
regular_staffing_and_training
🚨
Minor Incident
$1.9M/yr
Non-catastrophic equipment failure or single-person medical incident requiring emergency repairs, overtime, and limited medical/legal expenses.
robotic_manipulator_failure
brief_power_outage
single_person_TMR_medical_response
🚨
Major Breach
$2.8M/yr
Significant containment failure or prolonged manipulator failure leading to multiple TMR incidents, heavy medical/rehab costs, extended investigations and large legal/cover-up expenditures.
failed_closure_loop
multiple_subjects_within_radius
simultaneous_robot_and_power_failure
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#10] Site lead / administrative oversight and liaison. |
| Containment Technician | 2 | [#10] Containment technicians to operate openings, maintain procedures and run shifts. |
| Robotics Technician | 1 | [#10, #12] Responsible for manipulator operation, integration and maintenance coordination. |
| Medical Officer / Psychologist | 1 | [#10, #16] On-call medic/psychologist for acute response, assessment and rehabilitation coordination. |
| Administrative Staff | 1 | [#9, #25] HR/finance/cover identity administration and cross-site coordination. |
Confidence Notes
Analyst notes provide detailed line items and reasonable ranges, enabling mid-point estimates; however wide ranges for many items (staffing, legal/contingency, medical reserves) and site-dependent factors produce moderate uncertainty.